My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20107
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:09 PM
Creation date
1/13/2009 4:08:10 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20107
Document_Title
Amending the Eugene-Springfield Metro Area General Plan Diagram & Willakenzie Area Plan Diagram to redesignate property (Costco site) from Campus Industrial to Comm., & rezoning from I-1 to C-2/SR, gen. comm. with site review subdistrict.
Adopted_Date
2/23/1998
Approved Date
2/23/1998
CMO_Effective_Date
3/25/1998
Signer
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and Inset Map D to maintain consistency between the Metro Plan and the willakenzie Area Plan, <br />CRITERIA FUR EVALUATING A ZUNE CHANGE <br />The applicant has requested a concurrent zone change as provided for in EC 9.6743}. The following <br />criteria from EC 9.678 shall be applied by the City Council in approving or denying the zone change <br />request: <br />~a}: The uses and density that will be allowed in the location of the proposed change 1} can be <br />served through the orderly and eff dent extension of key urban facilities and services prescribed in <br />the Metropolitan Area General Plan, and 2} are consistent with the principles of compact and <br />sequential growth. <br />~b}: The proposed change is consistent with the Metropolitan Area General Plan 1 }applicable text, <br />2} specific elements related to the uses listed in the proposed zoning districts, and 3}applicable land <br />use designations. The written text of the plan takes precedence aver the plan diagram where <br />apparent conflicts or inconsistencies exist. <br />~c}: The proposed zone change is consistent with applicable adopted neighborhood refinement plans, <br />special area studies, and functional plans. In the event of inconsistencies between these plans or <br />studies and the Metropolitan Area General Plan, the latter is the prevailing document. <br />Based on substantial evidence in the record, the Eugene City Council finds: <br />Zone Change Criterion #1: <br />Section 9.678 a : The uses and densi that will be allowed in the location of the ro osed Chan e <br />1 can be served throu h orderl and efficient extension of ke urban facilities and services <br />rescribed in the Metro olitan Area General Plan and ~ are consistent with the rind les of <br />compact and seguen~al,,,,~rowth. <br />The subj ect property is fully served by City facilities. All necessary infrastructure is in place and <br />the fully improved roads can accommodate the projected increase in traffic. The zone change is <br />proposed to accommodate a planned expansion of an existing, successful retail establishment in a <br />C-2 General Commercial zone. The expansion, and by extension the zone change, are consistent <br />with the principles of compact and sequential growth since they utilize existing sites at urban <br />intensities. Based on this information, the proposed zone change will be consistent with this <br />criterion. <br />Zone Change Criterion #2: <br />Section 9.678 b :The ro osed chap e is consistent with the Metro olitan Area General Plan 1 <br />a licable text Z s ecific elements related to the uses listed in the ro osed zonin districts and <br />3 a licable land use desi nations. The written text of the Plan takes recedence over the Plan <br />Exhibit C - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.