Laserfiche WebLink
<br />FINDINGS AND RECgMMENDATIUNS <br />SUBJECT: PAVING, CURBS, GUTTERS, SIDEWALKS, WASTEWATER, <br />STgRM''V~ATER, STREET LIGHTS, AND STREET TREES qN AVALgN <br />STREET FRUM TERRY STREET Tq 2,70 FEET WEST qF TERRY <br />STREET (JOB #3666) <br />BACKGRgUND <br />This improvement project was initiated as a result of a irrevocable petitions signed as a condition <br />of development of properties adjacent to Avalon Street. <br />The City Engineer initiated the project, on April 30,1998, as provided for in Eugene Code <br />section 7.1608}. The City Council formed the Local Improvement District SLID} on July 27, <br />1995. <br />The project has been completed, and final assessment costs have been calculated. The property <br />awners were notified of the date and time of the final assessment hearing ten days in advance of <br />the hearing. <br />PROJECT <br />The pro ject constructed 2,700 feet of street improvements, including paving, curbs, gutters and <br />sidewalks, as well as the installation of wastewater and stormwater systems, street lights and <br />street trees. <br />ASSESSMENTS <br />The City Engineer has recommended that assessments be calculated in accordance with the <br />Eugene Code and the Council adopted directions at the time of the formation of the Local <br />Improvement District. <br />Under City of Eugene assessment policy, 60.5 percent of the improvement costs will be <br />distributed to the abutting property owners, with the balance x$210,594.47} financed by the City. <br />The final unit assessable costs, based on completion of the project are <br />20' Street Paving $ 50.701front foot <br />Sidewalks $ 14.511front foot <br />STREET PAVING, CURBS, GUTTERS, SIDEWALKS WASTEWATER, STQRMWATER, STREET LIGHTS <br />AND STREET TREES QN AVALQN STREET F4R 2,700 FEET WEST 4F TERRY STREET <br />FINAL ASSESSMENT Page I <br />