My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20183
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:40 PM
Creation date
1/14/2009 3:19:42 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20183
Document_Title
Levying assessments for paving, curbs, gutters, sidewalks, wastewater, street lights, and street trees on Avalon Street from Terry Street to 2,700 feet west of Terry Street, and declaring an emergency. (Contract 98-17) (Job #3666)
Adopted_Date
12/6/1999
Approved Date
12/6/1999
CMO_Effective_Date
12/6/1999
Signer
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FINDINGS AND RECgMMENDATIUNS <br />SUBJECT: PAVING, CURBS, GUTTERS, SIDEWALKS, WASTEWATER, <br />STgRM''V~ATER, STREET LIGHTS, AND STREET TREES qN AVALgN <br />STREET FRUM TERRY STREET Tq 2,70 FEET WEST qF TERRY <br />STREET (JOB #3666) <br />BACKGRgUND <br />This improvement project was initiated as a result of a irrevocable petitions signed as a condition <br />of development of properties adjacent to Avalon Street. <br />The City Engineer initiated the project, on April 30,1998, as provided for in Eugene Code <br />section 7.1608}. The City Council formed the Local Improvement District SLID} on July 27, <br />1995. <br />The project has been completed, and final assessment costs have been calculated. The property <br />awners were notified of the date and time of the final assessment hearing ten days in advance of <br />the hearing. <br />PROJECT <br />The pro ject constructed 2,700 feet of street improvements, including paving, curbs, gutters and <br />sidewalks, as well as the installation of wastewater and stormwater systems, street lights and <br />street trees. <br />ASSESSMENTS <br />The City Engineer has recommended that assessments be calculated in accordance with the <br />Eugene Code and the Council adopted directions at the time of the formation of the Local <br />Improvement District. <br />Under City of Eugene assessment policy, 60.5 percent of the improvement costs will be <br />distributed to the abutting property owners, with the balance x$210,594.47} financed by the City. <br />The final unit assessable costs, based on completion of the project are <br />20' Street Paving $ 50.701front foot <br />Sidewalks $ 14.511front foot <br />STREET PAVING, CURBS, GUTTERS, SIDEWALKS WASTEWATER, STQRMWATER, STREET LIGHTS <br />AND STREET TREES QN AVALQN STREET F4R 2,700 FEET WEST 4F TERRY STREET <br />FINAL ASSESSMENT Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.