My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20183
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:40 PM
Creation date
1/14/2009 3:19:42 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20183
Document_Title
Levying assessments for paving, curbs, gutters, sidewalks, wastewater, street lights, and street trees on Avalon Street from Terry Street to 2,700 feet west of Terry Street, and declaring an emergency. (Contract 98-17) (Job #3666)
Adopted_Date
12/6/1999
Approved Date
12/6/1999
CMO_Effective_Date
12/6/1999
Signer
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wastewater and stormwater infrastructure was required for one property within the local <br />improvement district. The assessment for this work is proposed to be imposed only on the <br />involved property. <br />Waste & Stormwater Pipe $ 21,085.75/Lump Sum (Tax Lot #17-04-20-14-00200) <br />The cost to the City for the City's portion of the development will be: <br />Cost to City: $210,594.47 intersection, street lights, storm drain, aver width paving}. <br />At the time of the formation of the focal impravement district, the City estimated the <br />improvement costs to be: <br />20' Paving $ 52.00/front foot <br />Sidewalks $ 17.30/front foot <br />Wastewater Pipe $11,860.00/Lump Sum (Tax Lot #17-04-20-14-00200) <br />Cost to City: $237,000.00 (intersection, street lights, storm drain, over width paving}. <br />The actual costs are lower than originally estimated, except for the wastewater and stormwater <br />improvements, which were modified at the property owner's request. <br />PUBLIC HEARING <br />The City Engineer provided the Hearings Official with a memorandum that outlined the City <br />Engineer's recommendation set forth above. A public hearing was held on November 17,1999, <br />beginning at 6:00 p.m. in the meeting room at the Public Works offices in the Eugene Hotel <br />building. Hearings Official Milo Mecham presided. A copy of the minutes of that public hearing <br />is attached as Exhibit A. <br />The comments at the hearing, and correspondence submitted prior to the hearing, concerned the <br />present property owner's objections to being subject to the assessment when they had purchased <br />the property after the formation of the local improvement district. <br />City Engineering staff disclosed at the hearing that the developer, Mr. Art Picullel, had promised <br />to pay a portion of the assessment of the properties in the development that triggered the <br />improvement. This development is also the location of those property owners who are now upset <br />at being subject to the assessment when they purchased without notice of the formation of the <br />local improvement district. <br />Discussion <br />As was discussed at the hearing, there is little that the city could do that has not already been <br />done to provide notice to persons in the situation of these property owners. Additional steps, <br />STREET PAVING, CURBS, GUTTERS, SIDEWALKS WASTEWATER, STORMWATER, STREET LIGHTS <br />AND STREET TREES ON AVALON STREET FOR 2,700 FEET WEST OF TERRY STREET <br />FINAL ASSESSMENT Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.