My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20119
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:12 PM
Creation date
1/15/2009 11:59:21 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20119
Document_Title
Ordinance amending the West Eugene Wetlands Plan by adopting new policies and plan text establishing planned transportation corridor and utility corridor wetland designations.
Adopted_Date
5/20/1998
Approved Date
5/20/1998
CMO_Effective_Date
6/20/1998
Signer
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Amendments to the West Eugene Wetlands Plan <br />Including New Policies and Plan Tegt Establishing <br />the Planned Transportation Corridor and Utility <br />Corridor Wetland Designations <br />The following amendments correspond to amendments numbered 61, 84, 85 and 86 in the <br />February 18,1998 Eugene City Council packet. <br />Add a new policy to Chapter Three of the Plan as follows and number a ro riatel <br />pp p y <br />Future fill within the Planned Transportation Corridors as shown on Wetland <br />Designations Map Map 3} shall be limited to those areas granted state andlor federal <br />wetland fill permits for the construction of planned public roadway improvements. New <br />roadway construction shall be limited to those projects listed in TransPlan as of Au ust <br />. g <br />10,1992, excluding those projects listed in Appendix B; no other new roads or streets are <br />permitted. Road widening and other improvements to existing roads or streets shall be <br />limited to those listed in TransPlan X1992} or in an adopted capital improvement Ian <br />. p <br />~CIP} as of June 30,1995. Road widening and other Improvements to existing roads or <br />streets within wetlands designated for protection or restoration shall require an <br />amendment of this plan to change the designation to "Planned Transportation Corridor" if <br />the project is not listed in TransPlan X1992} or in an adopted CZP as of June 30,1998. In <br />no case shall more than 1 acre cumulative} of protected wetland be re-designated to <br />Planned Transportation Corridor for improvements to an existing road or street, <br />Add new appendix to include: <br />The following TransPlan projects are no longer planned to be constructed and are <br />therefore not eligible for the Planned Transportation Corridor designation: <br />#150 Extension of Beltline Road from VL~.11~' to ~.18~ <br /># 162 Extension of Terry Street from ~V.11 ~' to Nest Eugene Parkway <br />#22$ Extension of Roosevelt Boulevard from Terry St. to Greenhill Road <br />Add the following definitions to the WEVL~I' glossary: <br />ut111 line is defined as any pipe or pipeline for the transportation of any gaseous, li uid <br />q <br />liquefiable, or slurry substance, for any purpose, and any cable, line or wire for the <br />transmission far any purpose of electrical energy, telephone and telegraph messa es, and <br />.. g <br />radio and television communication and any poles or others structures which su ort such <br />pP <br />
The URL can be used to link to this page
Your browser does not support the video tag.