My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19689
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:46:12 PM
Creation date
1/28/2009 12:49:25 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19689
Document_Title
An ordinance levying assessmenets for paving, storm and sanitary sewers in Terry Street from Barger Drive to approximately 1600-feet south, constructing a half street.
Adopted_Date
5/14/1990
Approved Date
5/14/1990
CMO_Effective_Date
6/14/1990
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- ~, ~ <br />FINDINGS AND RECGMMENDATIGNS <br />FXHTRTT "f~" <br />SUBJECT: PAVING, STGRM AND SANITARY SEWERS IN TERRY STREET FRDM <br />BARGER DRIVE TO APPROXIMATELY 1600-FEET SGUTH, <br />CONSTRUCTING A HALF STREET ~CGNTRACT 89-28} <br />BACKGROUND: <br />This project was initiated by a petition from the property owner. The property petitioning <br />for the improvements will bear 63.8 percent of the improvement cost. The remaining <br />improvement cost will be borne by the city. The city's share includes costs for city owned <br />frontage and for unassessable storm sewer to property outside the city boundaries. <br />Based an the petition, the City Engineer initiated the project, as provided far in the <br />Eugene Code 7.1648), on June 2, 1989.The property owner was notified of the pending <br />award hearing 10 days prior to the award hearing. The project was authorized for <br />construction by the City Council on August 14, 1989. The IoW bid was submitted by <br />Eugene Sand & Gravel, inc., for an amount of $195,647.3. <br />Upon completion of the project notice of assessments were sent to the affected property <br />owner, as of Monday, April 3I~. 1990 the City has not received any written objections. <br />PROJECT; <br />The project improvements includes 21-foot paving, half street curbs, gutters, storm and <br />sanitary sewers. <br />ASSESSMENT: <br />Under City of Eugene assessment policy, much of the cost is assessed to the abutting <br />property owners. The costs to be assessed are shown below; <br />21-foot paving <br />4" sidewalk <br />6~' storm sewer private} <br />Concrete driveway <br />Sanitary swr S" equivalent <br />Sanitary sewer levy <br />$ 67.75/front foot <br />$ 2.13/square foot <br />$ 42.52/lineal foot <br />$ 4.58/square foot <br />$54,733.55 <br />$21,728.08 <br />Costs listed below are the Engineer's estimate and preliminary costs quoted to property <br />owners at the award .hearing fallowing bid opening. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.