Laserfiche WebLink
Y <br />21-foot paving half street} $ 64.47~front foot <br />5" concrete $ 2.61~square foot <br />Concrete driveway $ 3.221square foot <br />4" concrete $ 2.33/square foot <br />6U"storm sewer $ 7U.~~llineal foot <br />FINDINGS AND REC~MMENDATI~NS <br />The final costs are slightly higher than preliminary casts quoted at the award hearing due <br />to extra work involved with stabilizing the soft subgrade conditions. The final costs are <br />comparable to a typical project of this size. Staff recommends appropriation of the <br />assessment distribution. <br />A hearing was scheduled for the above matter for May 1, 1994 at 7:DU p.m. Since no <br />persons indicated an interest in attending the hearing, it was cancelled. The Hearings <br />Official received a Memorandum from the City Engineer, outlining the above information. <br />Based upon the foregoing, the Hearings Official finds that the project has been bid and <br />constructed and the assessments have been determined consistent with the Code of the <br />City of Eugene. The Hearings official recommends that the City Council adopt an <br />ordinance assessing the properties as set forth above. <br />~G~if'L,~'R`' <br />Jack A. Billings, Hea ings Official <br />