Laserfiche WebLink
<br />Transportation Element <br />r <br />Revision 2I. Leo} Revise item ~a} under Transportation implementation Strat- <br />egy ~.2 on page 4l. <br />a. {Continuous} Sidewalks along both sides of the highway with a <br />priority on developing {continuous sidewalks an the south <br />side of Franklin Boulevard when Franklin_Boulevard is im- <br />roved . Note : Cans i derat~i on should be~ ~ ven ~~t~o extendi~n <br />sidewalks on the north side of Franklin from the S ri n f i e1 d <br />Brill a to the intersection with Glenwood Boulevard. However <br />the most westerl extent of sidewalks on the earth side of <br />Franklin Boulevard wi 1 l be_d_eci dell upon at the,,.., time Franklin, <br />im rovements are des ~ned.~ The d~esi n should consider the <br />need for edestrians to travel on the north side of Franklin <br />Boulevard westward from Glenwood Boulevard as well as the <br />h s i cal and to o ra h i cal restraints for 1 aci n a s i dewal k <br />north of the hi hwa at this location . <br />Revision 22. Leo} Add anew Policy 3 and discussion in the Transportation <br />Element an page 49 and renumber subsequent policies: <br />3. The Cit of Eu ene shall consider the feasibilit of canstructin a full <br />freewa interchan a at the intersection of Franklin Boulevard and I-5. <br />Discussion: The creation of anew freewa interchan <br />Boulevard waul d have a ma 'or i m act on western G1 enw~ <br />able trans ortation im lications far both the cities <br />S rin field. The feasibilit of such an interchan e <br />if construction of the interchan a seems likel the <br />ment P1 an should be amended to reflect these char es <br />Glenwood. <br />e at Franklin <br />ood and consider- <br />of_M_Euc~ene and <br />should be studied. <br />Glenwood Refine- <br />in western <br />Revision Z3. Leo} Belete implementation strategy 3.~ in the Transportation <br />Element on page 49 and renumber subsequent implementation strategies: <br />{3.1 In accordance with City ordinances, the City of Eugene should <br />require sidewalk installation as part of the issuance of building <br />permits.} <br />Revision 24. Leo} Revise implementation strategy 3.2 a. on page 50: <br />a,~ {When Glenwood is annexed to the City of Eugene, the City <br />shaul d implement a pl an to instal 1 sidewalks along Frankl i n <br />. ~. pr~.!~~°r~~~'~'}~ i ncl ud ~~ ny ~ di:y~~ ?" _ ~~y E~i g=: ~ ~~f -way and assessing the <br />cast of the construction of the sidewalks to the abutting <br />property owners.} The Cit and Count should work with the <br />Ore an De artment of Trans ortation to rovide sidewalks al an <br />Franklin Boulevard in con 'unction with other im rovements to <br />this State highway. <br />-G- <br />