Laserfiche WebLink
FINDINGS AND RECD ATIaNS <br />SUBJECT: BASINS A, B, AND C SANITARY SEWERS IN THE RIVER RUAD <br />AREA L(ICAL IlVIPRC~VENIENT DISTRICT <br />BACKGR[IUND <br />Dn May 29,1990 City Council initiated the local improvement district for sanitary sewers in the <br />River Road area for basins A, B and C. This district encompasses those parcels served by the <br />sanitary sewer construction in 1990 in the River Road area. The majority of the properties <br />taking sewer access from these facilities will be assessed based on a distribution of the <br />cumulative construction and staff service costs for the three basins and far the sanitary sewer <br />trunk levy of $0.425 per square foot of the total. lot area. In Ordinance No. 19725 adopted <br />October 22,1990} the council determined the Trunk Sewer Levy x$0.025 per sq. ft. }portion of <br />sanitary sewer assessments in River Road area is to be used to reimburse the City for the cost <br />of the extra capacity required in the sewer interceptor and lateral lines to serve properties within <br />the River Road area, That determination applies to these assessments. <br />Some of the properties in basin A are served by sewers constructed under a Lane County <br />construction contract. The assessment for these properties is based on the eight-inch equivalent <br />assessment method unit costs are identical to the 1990 basin assessment unit costs} as per EC <br />7.055. <br />Prior to the hearing regarding the initiation of the local improvement district on May 29, 1990 <br />property awners who will bear the costs were notified on May 4, well in advance of the <br />minimum 10-days' notice stipulated in the code. Additionally, on May 21, a newsletter was sent <br />out to all River Road property owners and residents which provided information on the estimated <br />assessment costs. Four properties were added to the district by their owners signing a waiver <br />of notification rights. The properties were included after staff field investigation determined that <br />providing service with this year's construction was logical and cost effective, These properties <br />and their owners are: <br />17-04-23-42-6601 Robert and Carol Dick <br />17-04-23-44-3900 Michael and Leslie Boggs <br />17-04-23-42-6100 Gale and Maxine Piquet <br />17-04-14-24-43x0 Derek Swezey <br />The sanitary sewers are projects constructed under three separate City contracts; 1}Basin A, 90- <br />09; 2} Basin B, 90-10; and 3} Basin C, 90-11. The previously mentioned segment within River <br />