Laserfiche WebLink
7.175 Local Im rovements - A vrtivnment of Assessments. <br />~1} Whatever share of the total estimated or actual project costs <br />of the local improvement is to be borne by the city and others shall be de- <br />ducted from the total praject costs before they are apportioned and assessed <br />under this section. The city shall pay the costs of the following, provided <br />funds are available and the project has appropriate priority: <br />~a} Extra capacity constructed in the improvement to serve <br />areas beyond the improvement district; <br />fib} Paving and sidewalks within the intersection of public <br />ways which costs may also be paid by assessing the abutting public <br />way; <br />~c} Storm sewers constructed as part of a street improvement <br />project within existing deve1aped areas; <br />~d} Other costs attributable to special canditivns or to <br />policies adopted prior to or at the time the council adopts the <br />resolution forming the local improvement district. <br />~2} The assessments for individual parcels of real property shall <br />be calculated and assessed as follows against the property specially bene- <br />fitted by the local improvement: <br />fib} The remainder of the costs of the improvement shall be <br />assessed against the property as follows: <br />5. Sanitar sewer assessments, The cast of sanitary <br />sewer construction shall be borne in the following manner: <br />a. The properties specially benefited by a sani- <br />tary sewer shall bear the cost of the sewer up to and <br />including eight inches of pipe diameter. The additional <br />cost of a sanitary sewer may be borne by the specially <br />benefitted properties, the city and others as provided <br />in subsection ~1} of this section. <br />b. Sanitar sewer service lines. Each parcel pro- <br />vided with a service line that extends from the eight- <br />inch or larger lateral sewer line to within IO feet of <br />the property line, shall be considered to have one ser- <br />vice line connection point. If mare than one service <br />line connection point is provided the parcel, it shall be <br />assessed for the actual number of service line connection <br />points. Far large, unplatted parcels, provided with one <br />or more service line connection points, each service line <br />connection paint shall be considered to serve an area of <br />not more than 120 feet in width, and not more than ~0 <br />feet on each side of the service line connection point. <br />A11 costs related to the service lines, including over- <br />head costs, shall be divided by the total number of ser- <br />vice line connection points, to determine the cost per <br />service line connection point. Each parcel shall be <br />charged for the number of service line connection points <br />provided. <br />c. Lateral sewer s stem, The lateral system shall <br />include all cost items, including overhead costs, related <br />to at least an eight-inch lateral system. These costs <br />shall be apportioned to each parcel on the basis of a <br />Ordinance - 9 <br />