My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19359
COE
>
City of Eugene
>
Ordinances
>
1980s No. 18550-19659
>
Ordinance No. 19359
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:44:22 PM
Creation date
2/11/2009 3:15:43 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19359
Document_Title
An ordinance granting to Group W Cable, Inc., a non-exclusive franchise for the operation of a Cable Communications System; and amending Ordinances Nos. 18284 and 18936. (Repealed by Ord. 19775)
Adopted_Date
10/14/1985
Approved Date
10/14/1985
CMO_Effective_Date
10/14/1985
Repeal_Date
5/13/1991
Signer
Brian B. Obie
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~4} Maintenance of Service. <br />~a} Grantee shall maintain a repair and troubleshooting force <br />capable of responding to subscriber camp1 ai nts wi thi n ~ working days after <br />receipt of the complaint, other than as may be due to circumstances beyond the <br />reasonable control of the Grantee. No charge shall be made to the subscriber <br />for maintenance of Grantee`s system unless the subscriber has negligently or <br />intentionally caused the damage. Amended by Ordinance No, X9359, ~0/~4/S5.} <br />fib} Grantee shall put, keep, and maintain all parts of the <br />cable communications system in good condition throughout the entire period of <br />this permit. <br />~c} The Grantee shall render efficient service, make repairs <br />promptly, and interrupt service only for good cause and for the shortest time <br />possible. Such interruptions, i nsofar as possible, shat l be preceded by <br />notice and shall occur during periods of minimum use of the system. <br />~d} In the event that a subscriber complaint is not resolved <br />to the mutual satisfaction of the subscriber and the Grantee, either the sub- <br />scriber or the Grantee may request that the matter be presented to the com- <br />missi on for final resolution by the commission or its designee. <br />fie} 4~hen there have been similar complaints made or where <br />there exists other evidence, which in the judgment of the commission casts <br />doubt on the reliability or quality of cable service, the commission shall <br />have the right and authority to compel the Grantee to test, analyze, and re- <br />port on the performance of the system. Such test or tests shall be made, and <br />the reports of such test or tests shall be delivered to the commission, <br />within ~4 days after the same have been requested by the commission. Such <br />reports} shall include the following information; the nature of the com- <br />plaint s} which precipitated the special tests, the system components} test- <br />ed and the equipment used and procedures employed in said testing, the re- <br />sults of such tests, and the method in which such complaints were resolved. <br />Ordinance - Z2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.