My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19359
COE
>
City of Eugene
>
Ordinances
>
1980s No. 18550-19659
>
Ordinance No. 19359
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:44:22 PM
Creation date
2/11/2009 3:15:43 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19359
Document_Title
An ordinance granting to Group W Cable, Inc., a non-exclusive franchise for the operation of a Cable Communications System; and amending Ordinances Nos. 18284 and 18936. (Repealed by Ord. 19775)
Adopted_Date
10/14/1985
Approved Date
10/14/1985
CMO_Effective_Date
10/14/1985
Repeal_Date
5/13/1991
Signer
Brian B. Obie
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 4. Commissian Authority. The Commission shall represent the <br />Grantor i n admi ~i strati on of the franchise, and advise the Grantor i n accord- <br />ance with the agreement between Lane County, City of Eugene, and City of <br />Springfield which established the commission. Upon enactment of this ordi- <br />nance, Grantors Lane County, City of Eugene, and City of Springfield shall <br />continue the life of the commission for the duration of the franchise. The <br />form, organization, and powers of the commission shall be determined jointly <br />by Lane County, City of Eugene, and City of Springfield, but the commission <br />shall have at least those powers referred to in this ordinance. Amended by <br />Ordinance No. X9359, 1C/~4/85.~ <br />Section 5. Services Provided. <br />~~~ Channel Ca acity. The cable communication system operated by <br />Grantee at the time this franchise was adapted provided ~D channels and was <br />increased tv a 35-channel capacity in accordance with the plan submitted by <br />Grantee. Before Grantee further increases the channel capacity of its cable <br />system, it shall submit to the commission reports containing relevant infor- <br />mation identified in Section ~3 of this ordinance no later than 60 days be- <br />fore undertaking installation of equipment to allow the commission to review <br />and comment on the proposal. The obligations of the Grantee and the commis- <br />sion as provided in Section 13 of this ordinance sha11 apply to these re-° <br />ports and the Grantee's submissions under Section 13 of this ordinance may <br />be in lieu of this requirement if submitted more than 60 days before Grantee <br />undertakes installation of equipment. Amended by Qrdinance No. 18936, <br />3/8/82; Ordinance No. X9359, 1C/14185.} <br />~2} Basic Service. ~a~ Basic service shall include 2~ channels <br />of cable capacity which shall have video program signals and services assign- <br />ed to each channel. idea programming shall not be encoded and shall include <br />al l of the fallowing categories: <br />Ordinance - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.