Laserfiche WebLink
MWMC FACILITIES PLAN <br /> <br />TABLE 6.2.1-4 <br />Facility Requirements for Alternative 2 al 2025 <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Total Required <br /> Secondary Capacity Capacity <br /> NPDES Permit Condition Aeration Basin Clarifiers (mgd) (mgd) <br /> <br />DWMM 2 (4 cells each) 12 60 59 <br />DWMW 3 (4 cells each) 16 86 86 <br />WWMM 3 (4 cells each) 12 119 111 <br />WWMW 3 (4 cells each) 16 167 165 <br /> <br />Results <br />The capital cost comparison and non-monetary comparison are summarized in Table 6.2.1-5. <br /> <br />TABLE 6.2.1-5 <br />Comparison of Facility Requirements, Cost, and Non-monetary Evaluation <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Additional Aeration Additional Secondary Cost <br /> Basins Required Clarifiers Required (millions of Nonmonetary <br />NPDES Permit Condition for 2025 for 2025 dollars) Evaluation <br /> <br />Alternative 1 0 2 $19.3 27 <br />Alternative 2 1 8 $39 15 <br /> <br />Alternative 1 is the recommended alternative for secondary treatment improvements. This <br />alternative provides the following advantages: <br /> <br />· Increases bioreactor capacity by increasing the mixed liquor concentration <br />· Modifications can be constructed within the existing infrastructure footprint <br />· Process reduces loading to the secondary clarifiers <br />· Improves sludge settleability and provides for its control <br />· Will provide consistent and complete nitrification <br />· Provides process flexibility for seasonal operation <br />· Operation is more efficient and provides financial benefits <br /> <br />In addition, alternative 1 is far more cost-effective and maximizes the use of existing <br />facilities. <br /> <br />6.2.2 Secondary Clarification Enhancements <br />As stated in section 6.2.1, the WPCF will need to increase its secondary treatment peak <br />capacity to address the projected increase in wastewater flows and the ever-changing and <br />more restrictive NPDES effluent limitations. The current peak wet weather secondary <br /> <br />6-10 MWIvIC_6.0_REV11.DOC <br /> <br /> <br />