My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. DEVELOPMENT AND EVALUATION OF ALTERNATIVES <br /> <br />characteristics of the fine screenings are so much different than those of the existing coarse <br />screenings. Once the flow passes through the screenings channels, separate grit removal <br />would be used for the expanded facilities. These grit removal facilities would be designed to <br />implement new technologies than used in the existing aerated grit chambers. Pretreated <br />effluent from the new facilities could then be routed back to the existing facility where the <br />effluent would be combined prior to preaeration, or the two separate pretreated effluents <br />could be combined downstream of grit removal and routed to primary clarification. <br />Additional grit and screenings loadout facilities would be required as part of the expansion. <br />The major new equipment and processes associated with this alternative include: <br /> <br />· Four (4) new fine screens (1/4-inch opening) <br />· Two (2) new screenings washer/compactors <br />· Four (4) Parshall flumes for flow measurement <br />· Four (4) new cyclonic grit separators <br />· Four (4) new grit pumps and cyclones <br />· Two (2) new grit classifiers <br />· Two (2) new screenings/grit hoppers <br /> <br />Alternative 2 - Construct New Pretreatment Facility <br />Alternative 2 considers constructing a new pretreatment facility east of the existing influent <br />screw pumps. This facility would be a new standalone facility that would require separate <br />influent pumping up to the influent channels. All of the technologies used in Alternative 1 <br />would be applicable to Alternative 2 except all would be located in the new facility and <br />would be independent. Flows in excess of the new facility capacity would be routed and <br />processed at the existing pretreatment facility. The major new equipment and processes <br />associated with this alternative include: <br /> <br />· Four (4) new fine screens (1/4-inch opening) <br /> Two (2) new screenings washer/compactors <br />· Four (4) Parshall flumes for flow measurement <br />· Four (4) new cyclonic grit separators <br />· Four (4) new grit pumps, concentrators, and classifiers <br />· Two (2) new screenings/grit hoppers <br /> <br />Results <br />For Alternatives 1 and 2, the screenings channels and grit separators would be covered and <br />the odorous air collected and treated in bioscrubbers. The cost comparison developed for <br />each alternative is relative because it does not include the costs associated with odorous air <br />ducting and treatment. The relative capital cost comparison and non-monetary comparison <br />are summarized in Table 6.2.4-1. <br /> <br />MWMC_6.0_REVI 1.DOC 6-15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.