My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[VlWMC FACILITIES PLAN <br /> <br />TABLE 6.2.4-1 <br />Summary of Pretreatment Expansion Alternatives Comparison <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Capital Cost <br /> Alternative (millions of dollars) Non-Monetary Ratinga <br />I - Expand Existing Pretreatment Facility $12.8 21 <br />2 - Construct New Pretreatment Facility $17 19 <br /> <br />Notes: <br />a Non-monetary score is out of a possible maximum score of 30 points. <br /> <br />Capital costs associated with construction of a new pretreat~nent facility are approximately <br />30 percent higher than for the expansion of the existing facility. The non-monetary <br />evaluation of the two alternatives indicates that expansion of the existing pretreatment <br />facility is slightly more favorable than constructing a new facility. Both alternatives will <br />have 160 mgd of capacity to minimize operation of the existing pretreatment facility, which <br />would only need to be brought online for peak flows. It was assumed that the new <br />pretreatment facility would have full grit removal capacity. As more detailed planning and <br />design efforts proceed for the expansion of the existing pretreatment facility, both of these <br />assumptions should be evaluated more closely. It may be more cost-effective to provide <br />only the required 102 mgd of additional capacity and provide flexibility to bring the existing <br />pretreatment facility online and offlLne more frequently, although this would be extremely <br />labor-intensive from an O&M standpoint. <br /> <br />An alternative to providing grit removal during pretreatment would be to degrit thin <br />primary sludge from the primary clarifiers. This may avoid construction of grit removal <br />facilities in the pretreatment expansion. As part of the approach to expand primary clarifier <br />capacity, the ability to pump thin sludge and thicken the primary sludge outside of the <br />clarifiers will be assessed. Grit accumulation in the primary clarifier centerwells is an issue <br />of concern that would have to be addressed if the degritting primary sludge approach is <br />pursued. <br /> <br />Based on the alternatives analysis, it is recommended that Alternative 1, expansion of the <br />existing pretreatment facility, be carried forward for facility planning purposes. Further <br />investigation of pretreatment capacity and grit removal will be carried out during <br />predesign. Upon further refinement of the pretreatment expansion, selection and <br />comparison of specific equipment associated with the selected alternative will be evaluated <br />more comprehensively. <br /> <br />6.2.5 Odor Control <br />It is anticipated that the WPCF will need to increase its odorous air treatment system to <br />address the projected increase in air flow rates resulting from the addition of new process <br />units throughout the plant. The existing odor control system consists of a three-cell, organic <br />media biofilter with a design capacity of 18,000 cubic feet per minute (ft3/minute) and a <br />connected capacity of 15,000 ft3/minute. The new odor control system would have sufficient <br />capacity to treat the existing odorous air flow rates and an additional 23,000 ft3/minute <br />anticipated for the new process units. Representative sizes for new facilities requiring odor <br />control have been selected and the resulting air flow rates calculated using the applicable <br /> <br />6-16 MWMC_6.0_REV11.DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.