Laserfiche WebLink
MWMC FACILITIES PLAN <br /> <br />TABLE 6.5.4-2 <br />Biocycle Farm Alternative 1 Capacity (dry tons) <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Liquid Biosolids on Dewatered Biosolids on <br /> Non-Buffer Areas Buffer Areas <br /> Year (425 Acres) (132 Acres) Total <br /> <br /> 2020 2228 675 2903 <br /> 2025 2128 612 2740 <br /> <br />The majority of the costs associated with Altemative 1 have already been absorbed in the <br />purchase of the land, installation of the distribution pipeline, construction of the BF pump <br />station (under construction), and the purchase of four hose reel application systems. Future <br />costs under this alternative include development of Phase 2 and Phase 3 expansions, and are <br />listed in Table 6.5.4-3. <br /> <br />TABLE 6.S.4~3 <br />Biocycle Farm Alternative 1 Cost Estimate <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Capital Cost <br /> Expansion Phase Item (2004 $) <br /> <br /> Phase 2 Site preparation of 130 acres $300,000 <br /> Purchase 2 hole reels $110,O00 <br /> <br /> Phase 3 Site preparation of 130 acres $300,000 <br /> Purchase 2 hole reels $110,000 <br /> <br /> TOTAL COST $820,000 <br /> <br />Alternative 2 - Operate BF as an Irrigated Land Application Site <br />Altemative 2 represents operating the BF as an irrigated land application site. The primary <br />benefit of this alternative is that a greater amount of biosolids (liquid and dewatered) could <br />be applied to the site. Under this alternative biosolids could be applied to the BF at the <br />capacities shown in Table 6.5.4-4. <br /> <br />TABLE 6.5.4-4 <br />Bi0cycle Farm Alternative 2 Capacity (dry tons) <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Liquid Biosolids on Dewatered Biosolids <br /> Non-Buffer Areas on Buffer Areas <br /> Year (425 Acres) (132 Acres) Total <br /> <br /> 2005 1880 824 2704 <br /> 2010 2561 905 3466 <br /> <br />6-44 MWMC_6.0_REV1 I.DOC <br /> <br /> <br />