My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. DEVELOPMENT AND EVALUATION OF ALTERNATIVES <br /> <br />TABLE 6.5.4-4 <br />Biocycle Farm Alternative 2 Capacity (dry tons) <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Liquid Biosolids on Dewatered Biosolids <br /> Non-Buffer Areas on Buffer Areas <br /> Year (425 Acres) (132 Acres) Total <br /> <br /> 2015 2165 824 2989 <br /> 2020 2561 905 3466 <br /> 2025 2451 824 3275 <br /> <br />As seen in Table 6.5.4-4, Alternative 2 provides an average of 17 percent more capacity than <br />Alternative 1. <br /> <br />Similar to Alternative 1, the majority of the costs associated with Alternative 2 have already <br />been absorbed in the purchase of the land, installation of the distribution pipeline, <br />construction of the BF pump station (under construction), and the purchase of four hose reel <br />application systems. However, Alternative 2 contains the future additional cost of <br />installation of a dedicated irrigation pipeline. Table 6.5.4-5 lists the major costs associated <br />with Alternative 2. <br /> <br />TABLE 6.5.4-5 <br />Bi0cycle Farm Alternative 2 Cost Estimate <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Capital Cost <br /> Expansion Phase Item (2004 $) <br /> <br /> Phase 2 Site preparation of 130 acres $300,000 <br /> Purchase 2 hole reels $110,000 <br /> <br /> Phase 3 Sile preparation of 130 acres $300,000 <br /> Purchase 2 hole reels $110,000 <br /> <br /> TBD Dedicated irrigation pipeline $1,500,000 <br /> TOTAL COST $2,320,000 <br /> <br />The dedicated irrigation system would consist of irrigation tubes on 20- to 30-foot grids with <br />rnicrosprays on a minimum 20- to 30-foot spacing. The irrigation tubes would be connected <br />to a submain manifolded off of a 14-inch buried pipeline. <br /> <br />There are several advantages to building a dedicated irrigation pipeline. The system would <br />provide a more efficient irrigation application and increase the biosolids receiving capacity <br />at the site. The pipeline would also reduce the labor requirements associated with current <br />irrigation methods. Thus, better application, less labor, and less money toward labor <br />associated with moving hose reels would result. <br /> <br />MWMC_6.0_REV11.DOC 6-45 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.