My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />TABLE 7.1.2-1 <br />Recommended Conveyance System Improvements <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Existing <br /> Capacity Recommended Responsible <br /> Pump Station (mgd) Capacity (mgd) Proposed Improvement Entity <br /> <br /> Division Street 1.4 2.0 Upgrade pumps for higher head Eugene <br /> conditions at fome main connection <br /> point, <br /> <br /> Skipper 8.0 10.5 Upgrade pumps for higher head Eugene <br /> conditions at force main connection <br /> point; install additional pump to meet <br /> redundancy requirements. <br /> <br /> Greenwich 1.5 3.0 Upgrade pumps for higher head Eugene <br /> conditions at rome main connection <br /> point. <br /> <br /> hvington 13.5 15.0 Upgrade pumps for higher head Eugene <br /> conditions at rome main connection <br /> point; install one additional pump. <br /> <br /> West irwin 21.0 28.5 Upgrade pumps for higher head Eugene <br /> conditions at rome main connection <br /> point. <br /> <br /> Terry Street 14.0 28.0 Upgrade pumps for higher head Eugene <br /> conditions at rome main connection <br /> point; install additional pump to meet <br /> redundancy requirements. <br /> <br /> Barger-Greenhill 7.5 32.0 Install phase 2 and phase 3 pumps in Eugene <br /> existing pump station; install new 24- <br /> inch force main. <br /> <br /> WPCF Screw 84.0 99.0 Install one additional screw pump. MWMC <br /> Pumps <br /> <br />7.2 Recommended Liquids Process Improvements <br /> <br />7.2.1 Secondary Treatment <br />Recommended enhancements to secondary treatment facilities include conversion of each <br />aeration basin (4 cells) to a step feed, plug flow activated sludge process with anoxic <br />selectors. The following modification are required and are shown in Figure 7.2.1-1: <br /> <br />· Addition of PE flow control gates for step feed of PE to each cell <br />· Addition of PI splitter control boxes to mix PE and RAS at each cell <br />· New primary effluent and RAS distribution header to each cell <br />· Addition of anoxic zone and anoxic mixers in each cell of each aeration basin <br />· Conversion of all coarse bubble aeration grids to fine bubble aeration <br />· New mixed liquor effluent gates in last cell of each aeration basin <br />· Enhance existing secondary clarifiers (see section 7.1.2) <br />· Two new secondary clarifiers <br /> <br />7-2 MWMC_7.0_REV4.DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.