My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. RECOMMENDED PLAN <br /> <br />Modifications provide flexibility for dry and wet weather operations to achieve seasonal <br />effluent requirements. Bioreactor capacity is h-~creased through increased average mixed <br />liquor concentrations, however, solids loading to the secondary clarifiers is reduced. Table <br />7.2.1-1 (located at the end of this chapter) summarizes the existing and proposed 2025 unit <br />process, equipment, and design criteria. <br /> <br />FIGURE 7.2.1-1 <br />Recommended Aeration Basin Modifications to Step-Feed, Plug-Flow Activated Sludge with Selectors <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> -- Pfima~y E~ue~: <br /> and PAS <br /> <br /> Header <br /> <br /> CI.riflem <br /> <br /> Pflrna~/Effluent <br /> ~oll~r Box and <br /> Conb'ol Gate <br /> <br />7.2.2 Secondary Clarification Enhancements <br />Recommended enhancements to each of the secondary clarifiers include the following items <br />and are shown on Figure 7.2.2-1: <br /> <br />· New energy-dissipatinginlet <br />· New flocculationwell <br />· New outboard launder <br />· New weir and scum baffle <br />· New scum skimmer arms <br />· New density current baffle <br />· Convert existing mechanism to suction manifold <br /> <br />Modifications to the operation of the existing secondary clarifiers will include adjustments <br />to the tmderflow concentrations and flow rates required to maintain a high solids <br />compaction zone and a low solids inventory in the clarifier. Additional RAS pumping is not <br /> <br />MWMC_7.0_REV4,DOC 7-3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.