Laserfiche WebLink
Project Name: Digester Improvements <br /> <br />Description: Replace gas mixing system for existing three digesters with a pump <br /> mixing system. <br /> <br />Justification: This project will increase the active volume of the digesters, thus allowing <br /> for additional solids stabilization volume and potentially deferring the need <br /> to construct an additional digester. <br /> <br />Project Driver: Need for improved digester mixing to increase active digester volume. <br />Project Trigger: Sludge residence time (SRT) and volatile solids reduction design criteria. <br />Type of Project 50% Capacity; 50% Performance <br /> <br />Estimated Project Cost $2,000,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2004/05 <br /> <br />Project Name: River Avenue Improvements <br /> <br />Description: Construct road improvements (from existing FY03/04 Budget) [MWMC <br /> staff to insert more detail as necessary] <br /> <br />Justification: [MWMC staff insert] <br />Project Driver: [MWMC staff insert] <br />Project Trigger: N/A <br />Type of Project 100% Rehabilitation <br /> <br />Estimated Project Cost $330,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2005/06 <br /> <br /> <br />