My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Biocycle Farm Phase 2 <br />Description: An additional 13(~ acres - site preparation begins in 8/05; planting in 3/06. <br /> <br />Justification: Land already purchased and provides additional area adjacent to BMF for <br /> application of liquid and dewatered biosolids. Expansion of the BF <br /> provides MWMC with more flexibility and control of overall biosolids <br /> management program. <br /> <br />Project Driver: Increased solids production at the E/S WPCF and currently storing an <br /> excess inventory of biosolids in the lagoons. <br /> <br />Project Trigger: BF Phase 1 loading limits for liquid and dewatered biosolids are reached. <br /> Also, might accelerate if loss of cooperative farming land application sites. <br /> <br />Type of Project 100% Performance <br /> <br />Estimated Project Cost $300,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2005/06 <br /> <br />Project Name: GBT Building Expansion (Waste Activated Sludge Thickening) <br /> <br />Description: Third gravity belt thickener (GBT) with associated at grade building. <br /> Assumes additional basement floor space is not required. <br /> <br />Justification: Provides additional capacity for WAS thickening and potentially delays the <br /> construction of additional digesters. <br /> <br />Project Driver: Additional capacity to provide WAS thickening with one unit offline at <br /> WWMW upper limit flow projections. Nitrification required by the NPDES <br /> permit and increasing wastewater flows and loads generates more WAS <br /> solids. Provide ability to conduct recuperative thickening so that need for <br /> additional digestion volume can potentially be deferred. <br /> <br />Project Trigger: Exceeding solids and hydraulic loading rate design criteria. <br />Type of Project 100% Capacity <br /> <br />Estimated Project Cost $2,500,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2005/06 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.