My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Additional Odorous Air Treatment - Part 2 <br /> <br />Description: Two 14-foot diameter, 30 foot tall biotowers for air collected from two <br /> primary clarifier centerwells and launders and new gravity thickener <br /> <br />Justification: Primary clarifier weirs and launders as well as gravity thickeners are odor <br /> sources. <br /> <br />Project Driver: Maintain MWMC's status as environmental stewards. Address <br /> neighborhood odor complaints and community concerns regarding odors. <br /> <br />Project Trigger: Construction of gravity thickeners. <br />Type of Project 100% Performance <br /> <br />Estimated Project Cost $2,300,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2008/09 <br /> <br />Project Name: Parallel Primary/Secondary Peak Flow Management <br /> <br />Description: Piping, pumping, and flow split boxes to enable primary and secondary <br /> treatment to be operated in parallel. <br /> <br />Justification: This project expands the peak wet weather treatment capacity to 277 mgd <br /> through flow management techniques. <br /> <br />Project Driver: DEQ requirement that the peak wet weather flow (5-year, 24-hour rain <br /> event) be treated by the E/S WPCF and meet secondary effluent <br /> standards (diverted blended flow receives equivalent of primary <br /> treatment). <br /> <br />Project Trigger: Elimination of sanitary sewer overflows by the year 2010. <br />Type of Project 100% Capacity <br /> <br />Estimated Project Cost $11,000,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2008/09 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.