My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />1. Monthly sewer user rates, which are the primary source of revenue for the RWP, are to <br /> be equitably allocated to all customers based on a cost of service assessment. <br /> <br />2. New customers to the RWP shall pay an SDC. The Commission shall maintain the SDC <br /> methodology within the constraints of state law. <br /> <br />3. Existing and new sewer customers shall equitably contribute to the cost of the RWP. To <br /> implement this policy, user rate and SDC methodologies will consider wastewater <br /> quantity, quality, and strength, consistent with state law. <br /> <br />4. MWMC rate structures shall be sufficient to fully fund reserves, comply with bond <br /> covenants, and cover the costs of constructing, operating, rehabilitating, maintaining, <br /> and improving the MW-MC assets. <br /> <br />5. The Commission will attempt to adopt user rates that provide multi-year stability. <br /> <br />6. Costs of existing and future capacity for new customers shall be recovered by SDCs that <br /> are based on the cost of existing and required new capacity. <br /> <br />7. Costs of services (direct and indirect) provided to any public or private organizations by <br /> the RWP shall be recovered through appropriate fees or charges. <br /> <br />Asset Management - Asset management policies are intended to guide the Commission in <br />protecting and safeguarding the investment in regional facilities and equipment. Capital <br />assets shall be kept in sound working condition. Replacement, maintenance, and <br />rehabilitation shall be provided for so that total system costs are minimized while reliable, <br />high-quality service and high water quality standards are maintained. <br /> <br />1. MWMC assets shall be insured for replacement value so that, in the event of a loss, plant <br /> and equipment could be restored to working condition. <br /> <br />2. The Commission shall maintain a fully-funded Equipment Replacement Reserve so <br /> equipment can be replaced or rehabilitated when needed without creating volatility in <br /> the operating budget. <br /> <br />3. Equipment provided for by the Equipment Replacement Reserve shall include all rolling <br /> stock, all computer equipment, and all other equipment with a historical cost between <br /> $10,000 and $200,000, a projected replacement cost between $10,000 and $200,000, and <br /> with a useful life expectancy of between 1 and up to 20 years. <br /> <br />4. Major rehabilitation work shall be funded from the Capital Reserve and appropriated <br /> annually into a budget line item called Major Rehab. <br /> <br />5. The Major Rehab work shall be capitalized if it extends the useful life of the asset <br /> beyond the original estimate. If the Major Rehab work does not extend the life of the <br /> asset, but enables the asset to reach its originally estimated useful life, then it will be <br /> considered major maintenance work and not capitalized. <br /> <br /> 8-4 MWMC_8.0_REV5 DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.