Laserfiche WebLink
8. FINANCIAL STRATEGY <br /> <br />8.3 Future Costs and Revenues <br /> <br />8,3.1 Operation and Maintenance Costs <br />An estimate of O&M costs, including personnel, materials, and service costs, is presented in <br />Table 8.2.1. As new facilities are placed on-line throughout the 20-year planning period, <br />these costs will be further refined. <br /> <br />TABLE 8.2.1 <br />MWMC Projected Personnel, Materials and Service Costs For Study Period <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br />Personal Services <br /> $181,400,000 <br /> <br />Materials & Services <br /> $169,840,000 <br /> <br />Capital Outlay <br /> $700,000 <br /> <br />Total <br /> $351,940.000 <br /> <br />8.3.2 Replacement Cost of Proposed System <br />Equipment replacement purchases were budgeted at $1,026,630 in FY 03-04; rehabilitation <br />was budgeted at $182,000 in FY 03-04. Annual Equipment replacement purchases and <br />rehabilitation expenditures are projected to average $1,100,000 and $400,000, respectively, <br />over the study period. <br /> <br />8.3.3 Capital Project Needs <br />As recommended in Chapter 7.0, MWMC intends to proceed with implementation of the <br />$144 million Alternative 5 - Parallel Primary/Secondary Treatment. If DEQ does not <br />approve Alternative 5, then MWMC intends to proceed with implementation of the <br />$157 million Alternative 4 - High-Rate Clarification (assuming that DEQ is willing to <br />approve Alternative 4 as the next best alternative). <br /> <br />8.3.4 Sources of Revenue <br />In the past, MW-MC has generated revenues from monthly sewer rates, SDCs, and special <br />assessments on property taxes associated with the general obligation bonds that were issued <br />for the construction of the original regional system in the 1980s. As was mentioned in <br />section 8.2, the general obligation bonds have been paid off and the current sources of <br />revenue are monthly sewer user fees and SDCs. It is assumed that these two methods will <br />continue to be the primary sources of revenue through the study period. <br /> <br />MWMC_8.0_REV5. DOC 8-5 <br /> <br /> <br />