My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />8.6.4 Biosolids <br /> <br />Waste Activated Sludge Thickening <br />Facility Component Allocation <br />This project is allocated entirely to Biosolids-General. <br /> <br />Project Type Allocation <br />This project would expand the capacity of WAS thickening and potentially defer <br />construction of additional digestion capacity. The allocation is assigned to Capacity. <br /> <br />Additional Digestion Capacity and Class A Capability <br />Facility Component Allocation <br />This project is allocated entirely to Biosolids-General. <br /> <br />Project Type Allocation <br />This project provides additional digestion capacity (approximately one-third of the cost) and <br />would convert MWMC to a Class A biosolids program (remaining two-thirds of the cost), <br />which would provide additional enhanced capability to address higher community <br />performance standards. The allocation is split one-third/two-thirds between Capacity and <br />Performance. <br /> <br />Digester Mixing Improvements <br />Facility Component Allocation <br />This project is allocated entirely to Biosolids-General. <br /> <br />Project Type Allocation <br />This project improves the performance of the existing three digesters. In doing so a larger <br />portion of the existing tankage can actually be used for digestion and therefore construction <br />of additional digestion capacity can be deferred. The project is allocated 50 percent to <br />Capacity and 50 percent to Performance. <br /> <br />Biocycle Farm Phases 2 and 3 <br />Facility Component Allocation <br />These projects are allocated to the Biosolids-Biocycle Farm. <br /> <br />Project Type Allocation <br />The Biocycle Farm provides enhanced capability and reliability to MWMC's overall <br />biosolids management program and is therefore allocated to Performance. <br /> <br />Biocycle Farm Biosolids Distribution Equipment <br />Facility Component Allocation <br />This project is allocated to the Biosolids-Biocycle Farm component. <br /> <br />Project Type Allocation <br />The BiocycIe Farm provides enhanced capability and reliability to MWMC's overall <br />biosolids management program and is therefore allocated to Performance. <br /> <br />8-12 MWMC_B.0_REV5.DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.