My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. FINANCIAL STRATEGY <br /> <br />Composting Facility <br />Facility Component Allocation <br />Similar to the Biocycle Farm, this project would further develop MWMC's pilot composting <br />program, which serves to enhance the capability and reliability of MWMC's overall <br />biosolids management program. This project is allocated to Biosolids-Biocycle Farm. <br /> <br />Project Type Allocation <br />Composting serves a similar purpose as the Biocycle Farm and is therefore allocated to <br />Performance. <br /> <br />Re. Line Lagoons Phases 1 through 4 <br />Facility Component Allocation <br />This project is allocated entirely to Biosolids-General. <br /> <br />Project Type Allocation <br />This project replaces the existing liners in the biosolids storage lagoons at the Biosolids <br />Management Facility and therefore is allocated to Rehabilitation. <br /> <br />Repairs/Partial Replacement of Biosolids Force Main <br />Facility Component Allocation <br />This project would repair and/or replace certain sections of the biosolids force main, which <br />conveys treated biosolids from the WPCF to the BMF. The project is allocated en~rely to <br />Biosolids-General. <br /> <br />Project Type Allocation <br />This project would rehabilitate the existing biosolids force main and is allocated entirely to <br />Rehabilitation. <br /> <br />8.6.5 Support Facilities <br /> <br />Maintenance Facility Improvements and Fiber Optic Wiring <br />Facility Component Allocation <br />These projects serve MWMC's overall efforts and are allocated to the Support Facilities <br />(Indirects) component. <br /> <br />Project Type Allocation <br />These projects would benefit both the growth increment and existing users by enhancing <br />staff's ability to operate and maintain MWMC's facilities. These projects are allocated to <br />Performance. <br /> <br />8.6.6 Effluent Reuse <br /> <br />Effluent Reuse <br />Facility Component Allocation <br />This ongoing program to develop reuse to mitigate water quality impacts to the Willamette <br />River is allocated entirely to Reuse Facilities. <br /> <br />MWMC_8.0_REV5.DOC 8-13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.