My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br /> New bank outfall <br /> New reuse disinfection facility <br /> New digester <br /> WAS thickening building expansion <br /> <br /> ~ Normal Secondary Treatment Flow Paths <br /> <br /> ~ New Dry and Wet Weather <br /> Dual Use Facilities <br /> <br /> ~ New Wet Weather Peak Flow Facilities <br /> <br />FIGURE 9.5.1-1 <br />Proposed Layout tor System Alternative 2 - High-Rate Clarification <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br />9.5.2 Water Quality <br />Impacts under System Alternative 4 would be substantially similar to water quality impacts <br />under System Alternative 5; that is, the quality of treated effluent discharged to the <br />Willamette River would be higher than under System Alternative 1. <br /> <br />Similar to System Alternative 5, effluent discharge trader System Alternative 4 would meet <br />NPDES requirements for TSS and CBODs. However, compared to Alternative 5, the High- <br />Rate Clarification alternative would slightly improve TSS and CBODs removal (Table <br />9.5.2-1). <br /> <br />9-20 MWMC 9.0 REV14.DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.