Laserfiche WebLink
9. ENVIRONMENTALREPORT <br /> <br />TABLE 9.5.2 -1. <br />Comparison of WPCF NPDES Permit Conditions with Predicted <br />Conditions Under System Alternative 4 {Hi,qh Rate Clarification) <br />MWMC Facilities P/an, Eugene-Springfield <br /> <br /> Permit Limit/Removal Predicted Discharge/Removal <br /> Parameter Requirements Efficiency <br /> <br /> Maximum Week TSS 28,000 lb/day 18,820 lb/day <br /> Maximum Week CBOD5 24,000 lb/day 13,908 lb/day <br /> Maximum Month TSS Removal 85 percent 88.0 percent <br /> Maximum Month CBODs Removal 85 percent 86.5 percent <br /> <br />Mitigation planning would be the same as that in System Alternative 5. Sediment and <br />erosion control BMPs and SPCC planning would be implemented during construction <br />activities. These practices would eliminate, reduce, or avoid the potential for discharge of <br />sediment, petroleum products, hazardous materials and debris to the Willamette River <br />during the construction period. <br /> <br />9.5.3 Biological Resources <br />Potential impacts to biological resources in the vicinity of the WPCF trader the High- Rate <br />Clarification alternative would be limited and essentially identical to those under the <br />Parallel Primary/Secondary Treatment alternative (see section 9.4.3). Temporary, <br />construction-related impacts on wildlife and habitat (e.g., from noise and dust generation) <br />would be minimal, because animals likely would avoid areas near construction activity. <br />Temporary riverbank disturbance from construction of the third outfall would be limited to <br />the immediate construction area and would be minimized through implementation of <br />construction BMPs and sedimentation and erosion control measures. Potential permanent <br />wetland losses resulting from installation of the third outfall would be mitigated through <br />direct measures (e.g., creation of replacement wetlands) or indirect measures (e.g., purchase <br />of credits from a mitigation bank). No direct wildlife mortality or other permanent habitat <br />alterations or losses are expected under System Alternative 4. <br /> <br />9.5.4 Air Quality, Odor, and Noise <br />Impacts to air quality, odor, and noise under System Alternative 4 will be similar to impacts <br />under System Alternative 5 (see section 9.4.4.). <br /> <br />9.5.5 Energy Management and Consumption <br />Similar to System Alternative 5 (see section 9.4.5), it is assumed that the WPCF would <br />consume more energy under System Alternative 4 than is currently consumed, as well as <br />more energy than would be consumed under System Alternative 1. As described for System <br />Alternative 5, the proposed upgrades would roughly double the capacity of the facility; <br />therefore, it could be assumed that under System Alternative 4 energy consumption would <br />increase relative to the amount of energy currently used. <br /> <br />MWMC_9.0_REV14.DOC 9-21 <br /> <br /> <br />