My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWMC FACILITIES PLAN <br /> <br />9.5.6 Floodplains and Soils <br />Similar to System Alternative 5 (see section 9.4.6), System Alternative 4 would not affect <br />area floodplains and would result in soil disturbance only during project construction <br />activities. <br /> <br />9.5.7 Land Use and Zoning <br />As with System Alternative 5 (see section 9.4.7) construction activities, System Alternative 4 <br />would not require use of additional land beyond the current facility boundaries, and thus <br />would not affect land use or zoning in the project area. Regionally, upgrades planned under <br />System Alternative 4 (as with System Alternative 5) would increase the treatment capacity <br />of the WPCF, and thus would facilitate residential, industrial, and commercial growth in the <br />Eugene-Springfield metropolitan area. <br /> <br />9.5.8 Transportation <br />Transportation issues under System Alternative 4 would be similar to those under System <br />Alternative 5 (see section 9.4.8). <br /> <br />9.5.9 Cultural Resources <br />As with System Alternative 5 (see section 9.4.9), the footprint of the WPCF would not <br />expand under System Alternative 4. Therefore, although cultural resources have not been <br />surveyed in the River Road area (Eugene Planning and Development Department, 2003), it <br />is unlikely that project activities within the already-disturbed facility boundary would affect <br />cultural resources. <br /> <br />9.5.10 Socioeconomics <br />Socioeconomic impacts under System Altemative 4 would be similar to those under System <br />Alternative 5 (see section 9.4.10). Construction activities could result in increased traffic in <br />the project area, and thus increases in noise, emissions, dust and traffic congestion on area <br />roads. Conversely, project construction would be expected to benefit the local economy <br />through job creation and materials sales. <br /> <br />9-22 MV,/MC_9.0_REV 14. DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.