MWMC FACILITIES PLAN <br /> <br />NPDES permit for wet weather. However, because peak wet weather flows are very dilute, <br />it is the solids percentage removal requirement that limits effluent CBOD and TSS levels <br />during critical wet weather flow periods and this is the most difficult to achieve. Peak wet <br />weather flow, not wet weather influent wastewater characteristics, currently constrains the <br />WPCF's design capacity. The plant has a wet weather peak design capacity of 175 mgd. <br />Current peak wet weather flows to the facility exceed 200 mgd, and only 200 mgd can <br />hydraulically be moved through the WPCF because of a redundancy that was required by <br />DEQ beyond the rated wet weather capacity. <br /> <br />SSO Limitations <br />Collection system modeling efforts estimate the current peak wet weather flow in excess of <br />250 mgd, a situation that now results in SSOs. Current peak wet weather flows exceed 200 <br />mgd, and are limited by both the collection system and plant capacity. An increase in both <br />peak flow conveyance and treatment capacity is necessary to comply with the MWMC <br />WWFMP objectives and policies to eliminate basement flooding and SSOs, as well as DEQ's <br />requirement that the wet season flow associated with the 5-year, 24-hour rainfall event be <br />accommodated by MWMC's facilities without resulting in SSOs. The MWMC WWFMP <br />policies also direct that an increase in the level of full secondary treatment be provided <br />through the expansion of the secondary treatment system. In addition, the treated peak flow <br />must meet the secondary treatment standard. This federal regulatory requirement will take <br />effect by January 2010 [OAR 340-41-0009 (6) and (7)]. <br /> <br />Blending and WWFMP Secondary Treatment Policies <br /> <br />Previous studies and collection system modeling efforts have concluded that peak wet <br />weather flows resulting from the 5-year 24-hour storm could be conveyed by the collection <br />system to the WPCF for treatment without SSOs. Under the 1997 Master Plan and 2001 <br />WWFMP modeling, it was determined that increased raw sewage pumping capability <br />(among other improvements) needed to be completed by 2007 to avoid non-permitted <br />overflows, and to conform to the objectives and policies of the WWFMP. However, current <br />experience and system modeling indicate that current peak flow estimate is in excess of 250 <br />mgd. Recent modeling efforts and actual system performance indicate that plant expansions <br />to avoid non-permitted overflows need to be constructed beginning in 2005. Current <br />collection system modeling results estimate the 2025 projected peak hour flow to the WPCF <br />to be 277 mgd. MWMC and the cities are continually collecting pre- and post- <br />rehabilitation/construction collection system flow data to assess the effectiveness of their I/I <br />reduction efforts. It is anticipated that the peak flow values will be periodically revised <br />based on the more current data and collection model calibrations and output. The current <br />data and information form the basis for increasing the peak flow capacity of the facility to <br />comply with DEQ's requirement to treat the 5-year, 24-hour rainfall event without resulting <br />in SSOs. <br /> <br /> Blending is not addressed in the current NPDES permit; however, blending of primary and <br /> secondary effluents is the current practice for treating the peak wet weather flows. Flows <br /> over 103 mgd (the secondary treatment capacity) receive primary treatment and are <br /> diverted around secondary treatment and blended with the secondary effluent. This <br /> blended effluent must meet current secondary treatment standards before it is discharged to <br /> the fiver. Increases in peak flows resulting from the elimination of SSOs will require that the <br /> <br /> 1-8 MWMC_1.0_REV13.DOC <br /> <br /> <br />