Laserfiche WebLink
MWMC FACILITIES PLAN <br /> <br />population is assumed to occur in year 2050, resulting in a population density of 18.1 <br />persons per acre. <br /> <br />Table 2.3.3-1 summarizes the population projections for Eugene-Springfield, Santa <br />Clara/River Road, and the combined MWMC service area at 5-year intervals over the study <br />period. <br /> <br />TABLE 2.3.3-1 <br />Population Projection Data for Eugene-Springfield Metropolitan Area <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> Eugene-Springfield Estimated MWMC Service <br /> Population Santa Clara/River Road Area Population <br /> Year Projections Population Pr~ections <br /> <br /> 2005 207,745 21,400 229,145 <br /> 2010 224,855 21,400 246,255 <br /> 2015 241,965 21,400 263,365 <br /> 2020 259,075 21,400 280,475 <br /> 2025 276,185 21,400 297,585 <br /> 2050 361,735 21,400 383,135 <br /> <br />FIGURE 2.3.3-1 <br />Population Projection Summary <br />MWMC Facilities Plan, Eugene-Springfield <br /> <br /> 400,000 <br /> 350,000 <br /> 300,000 ....~,~ .... <br /> 250,000 <br /> · ~ 200,000 <br /> <br /> 100,000 <br /> <br /> 50,000 <br /> <br /> 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050 <br /> <br />2-32 MWMC 2.0 REV23.DOC <br /> <br /> <br />