Laserfiche WebLink
r <br />M <br />and other considerations, such as safety, served as the rationale for the <br />policies, facilities, and services contained in TransPlan the <br />Transportation Plan]. TransPlan The Transportation Plan] also outlines <br />specific transportation goals, objectives and policies ~, and <br />recommendations] necessary to meet metropolitan transportation needs for a <br />o ul ati on of 293, 704 through the year 2400] . <br />Page 1 # 1-F-1, replace the second paragraph with the following; <br />The Eu ene-S rin field Metro olitan Bikeway Master Plan serves as the <br />basis far the metropolitan bikeway needs in the area. Originally adopted <br />in 1975, this plan needs to be updated to reflect the substantial bikeway <br />improvements made since 1915, to resolve some conflicts with the <br />Transportation Plan, and to respond tv continued community interest in <br />bicycling.] <br />TransPlan contains a metropolitan scale bicycle element which re laces the <br />1975~~~Eu ene~-S rin f i e~ d Metro of ~ tan Bikeway Master Plan . <br />Page 111-F-2- The following findings should be amended to reflect changes to T- <br />. zooo, the Bikeway Master Plan and the emphasis on a population bevel rather <br />than a f utu re year <br />Findin s; <br />1Z. A number of the policies contained in the Eugene-Springfield <br />Metro~o~ i tan Area X2000] Transportati an Plan TransPlan are directed <br />toward increasing the efficiency of existing transportation systems. <br />15.. Local [and metropolitan] bikeway plans have been adopted which <br />outline the future needs of the metropolitan area. Metro olitan <br />bikeway needs are contained i n TransPlan . <br />1 7, Current levels of local, state, and federal funding are inadequate to <br />meet the surface transportation needs forecasted for the future <br />o ulation of Z93_,70a~ X2000.] <br />~15. TransPlan meets all the S ublic facilit tannin requirements <br />wi th~~~ the exce ti on of a eneral condition assessment wh~~ch _,.~.~.i s <br />..~ ____ <br />cvntai ned i n the Publ i c Faci 1 iti es P1 an Technical Re ort. <br />Renumber the remaining findings accordingly. <br />Page III-F-3, amend finding #22 to be consistent with Lane Countyts Rural <br />Comprehensive Plan: <br />2Z. 1n addition to the General Plan and the Mahlon Sweet Field Master <br />Plan, Lane County's General [Willamette-Long Tom Subarea] Plan <br />affects the land uses within the airport environs within <br />approximately five miles of the airport proper} . <br />Page Ill-F-4, amend policy #1 to delete. reference to T-ZOOO and the Bikeway <br />Master Plan and replace with reference to TransPlan; <br />5 <br />