Laserfiche WebLink
[14.]1. West Eugene Parkway ~Sth/lth Extension}, Oak Hill to Carfiel <br />d <br />Street <br />. Landscape design features for this facility...usin the Desi n <br />Guy del i nes for Futur g g <br />e Entrance Beautification Projects. ~n acquiring <br />right-of-way and developing final designs far this future entrance <br />corridor, street trees planted as part of the project should be carefull <br />Y <br />located to ensure they can be retained in the event of future widenin s. <br />Dther im rovements alon this corr' 9 <br />P g ~ dor are 1 ~ kely to occur i n conk uncti on <br />.with landscape and buffer requirements associated with adjacent rivate <br />levelo meet or in ublic ro'e P • <br />P p p ~ cts to screen any ex~ sty ng uns~ ghtly v7 ews <br />~ n strateg ~ c 1 ocat~ on s . , . <br />[15.]13. West 11th Avenue, Greenhill to Chambers <br />When the western section ... Thi s pro j ect involves [three four subel ements <br />to improve West 11th as an entrance to Eugene: <br />Improvements along the entire length of this entrance corridor should be <br />.sure to incorporate construction of sidewalks, to fill in the gaps in the <br />existing sidewalk system serving the area. ~. <br />S, .Under Dther Entrance Points and Corridors on page 1? add material on <br />. three additional entrance corridors inadvertently left~~out of the dra <br />ft <br />and renumber the remaining corridor Amtrak Station, as follows: <br />1~. Coburg Road, Interstate 105 to Crescent Street <br />Coburg Road serves as a significant entrance corridor to points within <br />Eugene, including points north of the downtown area. In li ht of the <br />potential for visitors to enter g <br />bath from the Preferred Entrance Corridor <br />B-1, along 105, travelling north on Coburg Road, as well as the otential <br />for their entrance an Beltline o p <br />R ad, travelling ether north or south on <br />Coburg Road, this section of the Coburg Road corridor has been added. <br />With the establishment of a Special Light Industrial Site and subse uent <br />q <br />.planning work on property. north of Beltline and Cobur Road the <br />..northern bvundar of this ~~ ~ 'g <br />y entrance corridor has been defined at <br />Crescent Street. ~ This ~sectian of Coburg Road has not been identified <br />for specific improvements within the public right-of-wa An <br />improvements that reco nize y y <br />. 9 its role as an entrance corridor to Eugene <br />are likely to be Implemented ~n conjunction with landscape and buffer <br />requirements for adjacent private development. <br />15. 30th Avenue, interstate Five to Hilyard Street <br />This entrance corridor has been identified as one of the rural entrances <br />into Eugene, usually for visitors with destinations in the southern art <br />p <br />of the community. As Hated in the introduction to the stud ublic <br />efforts will come fare y~ p <br />. g ly In the form of review of future development <br />proposals along this corridor to ensure that existing natural landsca e <br />p <br />qualities and panoramic views can be retained along this entrance from <br />S <br />