Laserfiche WebLink
The following project from the Medium-Range Phase is to be modified. <br />The modification is identified by the addition in italics. <br />211.) <br />Franklin Blvd intersections: <br />- ,provide additional turn ~ ones and signal <br />improvements an Franklin.Blvd. at: <br />Broadway <br />Patterson <br />Halyard <br />Agate <br />~!i 1 ~ and <br />Dnyx <br />Cost: ~~,800,000 <br />Justification: LDS,Q <br />Juri sdi cti on : ODOT <br />Discussion: The need for the addition of Dnyx to the intersections <br />inc.2uded in this project was determined through the City of Eugene's <br />Central Area Transportation Study. <br />The following projects are to be added to the Medium-Range Phase. <br />292.) - <br />18th Avenue at Agate Street: <br />- install traffic signal <br />Cost: X105,000 <br />JustifiCatlOn: LDS,S,~ <br />Juri sdi cti an : Eug <br />Discussion: The need for this signal Was determined through the City of <br />Eugene's Central Area Transportation Study. <br />293. <br />58th Street at Thurston Road: <br />- install traffic signal <br />Cost; $105,Q00 <br />Justification: LO5,5 <br />Juri sdi cti an: Spr <br />Discussion: Continued land development in the Thurston area will <br />necessitate this project Within 3 to 14 years. <br />~.. <br />