Laserfiche WebLink
155.E <br />Lenten n is t at 10th Street: <br />- instal traffic signal <br />Cost: ~~05,DDD <br />Justificatian: LQS,S,D <br />Jurisdiction: Spr <br />Discussion: The intersection already meets signal warrants. .It is in the <br />current TIP and is being processed for FAU funding and construction in <br />1989. <br />195.E <br />15th Avenue at Agate Street: <br />- install traffic signal <br />Cost: ~105,ODD <br />Justification: LQS,S,o <br />Jurisdiction : Eug <br />Discussion: The treed for this signal was determined through the.City of <br />Eugene's Central Area Transportation Study. <br />19fi. ~ w <br />Hilyard, between 1~th and 13th Avenues: <br />- install traffic signal <br />Cast: $15,000 <br />Justification: 5,Q <br />Jurisdiction : Eug <br />Discussian: The need for this signal was determined through the City of <br />Eugene's Central Area Transportation Study. <br />197. ~ <br />11th Avenue at Kincaid Street: <br />-install traffic signs] <br />cast: ~~o~, o00 <br />Justification: LQS,S,Q <br />Jurisdiction : Eug <br />Discussion: The need for this signal was determined thraugh the City of <br />Eugene's Central Area Transportation Study. <br />198.} <br />South 5th Street, Main to South B : <br />-widen street <br />-' install curbs, gutters and side~alks <br />Cost: X600,000 <br />Distance: 0.2 <br />Justification: ED,A <br />Jurisdiction: Spr <br />Discussion; This project wil,~ provide access to the Booth-Belly center. <br />