My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19044
COE
>
City of Eugene
>
Ordinances
>
1980s No. 18550-19659
>
Ordinance No. 19044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:42:57 PM
Creation date
3/4/2009 1:09:01 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19044
Document_Title
Levying assessments for paving, sanitary sewer & sidewalk within & adjacent to Chippendale Subdivision; & storm sewer 650 ft. north of Harlow Rd. from Arcadia Dr. to Calvin St.; & st. sewer 1450 ft. north of Harlow Rd. from Arcadia Dr. to 300' east.
Adopted_Date
10/25/1982
Approved Date
10/25/1982
CMO_Effective_Date
10/25/1982
Signer
R. A. "Gus" Keller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - <br />ORDI"~.ANCE "i~. ~"--• <br />AN OrDIN.A«CE LEVYING ~sESSMr~tzs GuR paving, sanitar se~~~er and ' <br />.adjacent to Chippendale Subdivision; and storm sec~ayr sidewalk within and <br />from Arcadia Drive to Calvin. Street' and st e 654 feet north of Marlow Road <br />orm se~i~er 145J feet north of f~ar1o~r Road <br />from Arcadia Drive to 300 feet east <br />in the City ar E=gene, Lane County, Oregon. ". <br />RcCITALS: . <br />The City Council of the City of Eugenz did by Resolution No. 3___~ 5 ~ 9 ,adapted ~f~n a 1Q _ <br />. 19~,~, determine to pave streets and construct sanitary sewer and sidewalk within and <br />adjacent to Chippendale Subdivision and construct a storm sewer 6 <br />Harlow Road from Arcadia Drive to Calvin Street; and constr c 50 feet north of <br />north of 8arlaw Road from Arcadia Drive to 3D0 feet east, u t a storm sewer 1450 feet <br />The City Council authorized the execution of a contract for the construction of the local <br />. improvements on duly 13 ls$1 . <br />The local improvements have been constructed in accordance with the contract and a liable <br />PP <br />.provisions of the Eugene City Cade and the cost thereof and amount to be assessed have been ascertained to be: <br />Item i. Cash Payments to Contractor - Contract z 81-16. $ 242,245.99 <br />Contract <br />Item 2. Maintenance Retainage <br />Item 3. Other Costs (Describe) <br />Item 4. Deferred Assessments (Type) ~3) '~ 26,244.93 <br />Item 5, fimount of Remaining ~(arrants Issued to Complete Contract • <br />Item C, Total ,mount for Contract ~ 81-16 ~ - ~ 242,245.99 <br />Item 7. Less -City's Share of Cost far Completed Contract - 19,672.$6 <br />Item 8. Plus - <br />a. DUE TO GENERAL FUND for liquidated Damages 14D.OD <br />Item 9- Amount to ~Ihich City Charges are Applied ~ ~ 222 613.13 <br />Item 10. ~ Plus -Unpaid Balance of City's Share See Item 24 Below} ~ _.19 672 $6 <br />9 + <br />Item 1 i . Less - Liquidated Damages - 140. DD <br />Item l2. Less -Other Costs {Describe) ~ ~~ <br />Item .13, Plus - Overpayment to Contractor by Warrant <br />Item.14. ASSESSMENT k'ORK IK PROCESS 242,2D5.99 <br />Item l5, Plus-overpayment to Contractor fn Cash <br />Item 16, Plus-15/ of Item 9-City Charge for Engineering <br />&o Inspection 33,44D.9~ <br />Plus-2/ of Item 9-City Charge far Internal <br />Service <br />P1 us- Warrant Interest .. 4,453.46 <br />11~,772,D5 <br />TOTAL CITY CHARGE ~~. a ~ <br />a. DDE TO WARRAi~T REDEMPTION! P'DI~D ~~ 626. ~8 <br />Item 17. P?us - CUE TO SEWER UTILITY for l/Z~ SPECIAL SEWER LEVY - 49,626.48 <br />. 2,2DD.83 <br />Item 18. Flus • DUE TO SEXIER UTILITY for Lateral Sewer <br />• Equivalent of Trunk Sewer Syste:~ <br />• Item i9. Plus - DUE TO f~ARRhNT RtD€MPTION FUND far Engineering 2 <br />Charges on City's Share of Costs ~ ' ~ ~4 • ~4 <br />Item 2O, Plus - Other Costs (Describe) <br />Item 21, Plus - .Liquidated Damages ~ 144, DO <br />Item 22. Less -~~~x~~,~x~,~.~~~t Pre-paid engineering - 8,930.99 <br />Iter~ 23. ASSESSMENT RECEIV~~LE - Total Assessments perhOrd'C ace S 288,193.25 <br />Iter~ 24. Cit 's Share of Cost for Com feted Contract: ' <br />Account Amount Paid on <br />Construction Monthly <br />No• En ~ Costs .Estimates TCTAL <br />Intersections 851.93. •~ 5,679.46 6 531.3.9 <br />332-9332-G1739-90G814 2,099.D1 13,993.40 ~16 492.4 <br />1 <br />TOTAL: 22,623.80 <br />Ordinance - 1 <br />°.W,ENGR.ADM C70 2,82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.