My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-96-28
COE
>
City of Eugene
>
Administrative Orders
>
1995-99
>
Admin Order 58-96-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:50:21 AM
Creation date
4/7/2009 5:39:20 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
12/11/1996
Document_Number
58-96-28
CMO_Effective_Date
12/11/1996
Author
Gary L. Ludeke
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Administrative Order <br />of the <br />Traffic Engineer of the City of Eugene, Oregon <br /> <br />Establishing A Temporary Speed 30 Zone on <br />the Ferry Street Bridge Corridor, consisting of <br />the Ferry Street Bridge Overpass and Coburg Road south of Oakway Road <br /> <br />Criteria for Administrative Action <br /> <br />The administrative action of the Traffic Engineer of the City of Eugene, Oregon, establishing a <br />Temporary Speed 30 zone on the Ferry Street Bridge Corridor is based on the criteria listed <br />below. These criteria only address the effects of the Speed 30 zone, and do not address effects of <br />the Ferry Street Bridge Project. <br /> <br />(a) Traffic engineering principles and traffic investigations: <br /> <br />. Roadway and intersection capacity: Roadway and intersection capacity will <br />be reduced by the Proj ect. Capacity would be further reduced by any <br />accidents that occur in the corridor. To the extent that the Speed 30 zone <br />would help reduce accidents, it would improve roadway capacity. <br /> <br />. Safety: The accident potential will be reduced. Lower vehicle speeds will <br />allow motorists more time to react to unexpected situations. <br /> <br />. Traffic signs, markings and signals: All signing to be added will comply with <br />the Manual on Uniform Traffic Control Devices. <br /> <br />. Intersection Control: Not applicable. <br /> <br />. Roadway lighting: Not applicable.. <br /> <br />. Access control: Not applicable. <br /> <br />. Speed zoning: The existing Speed 40 zone will be lowered to Speed 30 for <br />the duration of the Project. The Speed 40 zone would be reinstated <br />upon completion of the Project.. <br /> <br />(b) Standards, limitations, and rules promulgated by the Oregon Transportation <br />Commission or the Oregon Public Utility Commission or their successors. <br /> <br />. No applicable standards, limitation, or rules apply. <br />
The URL can be used to link to this page
Your browser does not support the video tag.