My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-98-05
COE
>
City of Eugene
>
Administrative Orders
>
1995-99
>
Admin Order 58-98-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:50:24 AM
Creation date
4/7/2009 6:05:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/3/1998
Document_Number
58-98-05
CMO_Effective_Date
3/3/1998
Author
Gary L. Ludeke
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(i) The physical condition and characteristics of the street and abutting property. <br /> <br />+ Pearl Street is a one-way, 42 foot wide asphalt street in a 66' right-of-way. The <br />existing street use, from the east side to the west side, consists of metered <br />parking, a bike lane and three travel lanes. There are sidewalks on both sides of <br />the street. <br /> <br />.. .~ <br /> <br />+ The abutting property on the east side of Pearl Street consists of small retail <br />stores, a Greyhound bus depot, a motel and a bank. The west side has a surface <br />parking lot, two parking garages and a Firestone tire store. The new retail spaces <br />are on the ground floors of the parking garages at the northwest and southwest <br />comers of 10th-Pearl. <br /> <br />(j) Emergencies. <br /> <br />+ Emergency vehicle services won't be affected by this project. <br /> <br />(k) The public health, safety, and welfare. <br /> <br />+ The public health, safety and welfare won't be affected by this project. <br /> <br />(1) Special events of community interest including parades and public gatherings. <br /> <br />+ Special events won't be affected by this project. <br /> <br />(m) Construction within or adjacent to the street. <br /> <br />+ Construction within or adjacent to the street won't be affected by this project. <br /> <br />(n) Establishing conditions upon the use of parking. <br /> <br />+ The project will result in a net gain of one metered parking space and one <br />commercial parking space. Twelve metered parking spaces and one commercial <br />space will be removed from the east side of the street. These will be replaced by <br />thirteen metered spaces and two commercial parking spaces on the west side of <br />the street. <br /> <br />+ The existing metered spaces south of 1 Oth Avenue receive moderate usage. It is <br />anticipated that the new spaces will be used more, after the new retail spaces are <br />occupied. . <br /> <br />+ The commercial space that will be removed is south of 11 th Avenue. The two <br />new commercial spaces are north of 11 th Avenue, so they won't provide a <br />replacement for the removed commercial space. On-street parking south of 11 th <br />A venue will be examined if the loss of the commercial space creates a problem <br />for area businesses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.