Laserfiche WebLink
Metropolitan Wastewater Management Commission Budget Message <br /> <br /> BUDGET MESSAGE <br /> <br />METROPOLITAN WASTEWATER MANAGEMENT COMMISSION MEMBERS: <br />Introduction <br /> <br />Consistent with the Intergovernmental Agreement, I am presenting a proposed budget for FY 04- <br />05 that funds operations, administration, and capital projects planned for the Regional <br />Wastewater Program (RWP). The Metropolitan Wastewater Management Commission <br />(MWMC) administration and Capital Improvements Program (CIP) components of the budget <br />are reflected in the regionally funded portions of the City of Springfield's Environmental <br />Services Division, Public Works Administration and Finance Department budgets. The <br />operations, maintenance, equipment replacement, and major rehabilitation components are <br />reflected in the regionally funded portions of the City of Eugene's Wastewater, Engineering and <br />Maintenance Divisions' budgets. The Cities' Industrial Pretreatment Programs, managed locally <br />in compliance with the MWMC Model Ordinance, also are included in the RWP budget. <br /> <br />The CD portion of the budget for FY 04-05 includes funding for several ongoing capital <br />projects, including: development of the Biocycle Farm and associated reclaimed water <br />distribution infrastructure, and completion of the MWMC Facility Plan for the Regional <br />Wastewater Facilities. Unexpended funds for these projects, which were budgeted in FY 03-04, <br />are being carded forward into FY 04-05 to support actual project schedules. New capital projects <br />in the FY 04-05 CIP and budget include improvements to the primary clarifiers, secondary <br />clarifiers, and the south aeration basins, among others. Other Capital Programs, including Major <br />Rehabilitation, Equipment Replacement, and Major Capital Outlay also are fully funded in the <br />proposed FY 04-05 CIP and budget. <br /> <br />The proposed FY 04-05 RWP Operating Budget includes a 5.65 FTE increase in the City of <br />Springfield staffing necessary to begin the coordination, design and construction management for <br />the new capital projects identified in the MWMC Facility Plan. City of Eugene staffing also will <br />increase by 2.22 FTE to account for reallocation of staff in regional versus local programs and a <br />modest increase in new personnel in the Wastewater Division. Except for staffing levels, RWP <br />managers prepared budgets that absorb unavoidable cost increases where possible. Most of the <br />proposed budget increases associated with ongoing administration and operations are for non- <br />discretionary costs such as fees, utilities and employee benefits. The proposed FY 04-05 RWP <br />Operating Budget increases the user fee contribution to the Capital Reserve to $3,000,000, after a <br />one-year reduction. This action was in keeping with Commission direction and the 200,~ <br />MWMC Financial Plan, and will be needed to help fired upcoming capital projects. <br /> <br />Together, these actions result in a 39% increase in the FY 04-05 Operation Budget as compared <br />to the originally .adopted FY 03-04 Operating Budget. The revenues required to fund the FY 04- <br />05 Operating Budget will necessitate a 24% user rate increase. This new rate will result in an <br />average residential billing of $11.28 per month, based on a typical residential water consumption <br />of 5,000 gallons. <br /> <br /> April, 2004 DRAFT Page 1 FY 04-05 BUDGET AND CIP <br /> <br /> <br />