My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C - MWMC Budget/CIP
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/24/04Mtg
>
Item 2C - MWMC Budget/CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:31:50 PM
Creation date
5/20/2004 9:40:43 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/24/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Budget Message <br /> <br /> Budget Highlights <br /> <br />· FY 04-05 staffing allocations to the RWP have increased, in order to accommodate the <br /> increased workload associated with the management, design and funding of new capital <br /> projects. The total FTE for the RWP in FY 04-05 is budgeted at 84.41; as compared to 76.54 <br /> in FY 03-04; this includes 5.65 FTE for Springfield associated with capital projects and <br /> document archiving, while the Eugene Wastewater Division added 2.22 FTE to address <br /> shifting priorities and funding allocations. <br /> <br />· With the exception of new staff, RWP personnel services costs will increase by about 3.8% <br /> overall which reflects the combined effects of projected 1% cost of living adjustment for <br /> Eugene, and a 2.5% cost of living adjustment for Springfield. The remainder largely due to <br /> increases in health insurance. <br /> <br />· The proposed FY 04-05 materials and services budget reflect staff's efforts to maintain the <br /> overall RWP budget as flat as possible, while accommodating new staff and unavoidable <br /> increases in areas such as insurance premiums. <br /> <br />Budget Assumptions <br /> <br />The following assumptions and/or projections form the basis of the FY 04-05 RWP Operating <br />Budget: <br /> <br />· The MWMC Key Outcomes and corresponding performance measures for FY 04-05, along <br /> with the MWMC Services Agreement, form the basis for the RWP Work Plan and Operating <br /> Budget. <br /> <br />· New National Pollutant Discharge Elimination System (NPDES) discharge permit <br /> requirements will be addressed operationally and in planning/development of CD projects,' <br /> and all permit conditions are intended to be met. <br /> <br />· New environmental challenges (e.g. Clean Water Act regulations) will be monitored and <br /> responded to. <br /> <br />· The addition of new staffwill lead to increased expenditures in some materials and services <br /> categories. Where possible, ongoing expenses are held fiat or reduced to offset unavoidable <br /> increases in some budget categories. <br /> <br />· For budget purposes, utility costs at the RWP facilities are assumed to increase by 6%. <br /> Actual cost increases will be a function of weather and potential additional increases in <br /> Eugene Water and Electric Board's wholesale power costs. Supplemental budget actions in <br /> FY 04-05 may be needed to fully fund actual utility expenses. <br /> <br />· Proposed annual cost of living wage adjustments include a 1% increase in base salaries for <br /> Eugene, and a 2.5% increase in base salaries for Springfield. <br /> <br />· Property and liability insurance costs are expected to increase up to 20% over FY 03-04 <br /> amended budget levels, due to inflation and the addition of new MWMC capital assets. <br /> <br /> April, 2004 DRAFT Page 2 FY 04-05 BUDGET AND CIP <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.