Laserfiche WebLink
Metropolitan Wastewater Management Commission Budget Message <br /> <br /> Budget Highlights <br /> <br />· FY 04-05 staffing allocations to the RWP have increased, in order to accommodate the <br /> increased workload associated with the management, design and funding of new capital <br /> projects. The total FTE for the RWP in FY 04-05 is budgeted at 84.41; as compared to 76.54 <br /> in FY 03-04; this includes 5.65 FTE for Springfield associated with capital projects and <br /> document archiving, while the Eugene Wastewater Division added 2.22 FTE to address <br /> shifting priorities and funding allocations. <br /> <br />· With the exception of new staff, RWP personnel services costs will increase by about 3.8% <br /> overall which reflects the combined effects of projected 1% cost of living adjustment for <br /> Eugene, and a 2.5% cost of living adjustment for Springfield. The remainder largely due to <br /> increases in health insurance. <br /> <br />· The proposed FY 04-05 materials and services budget reflect staff's efforts to maintain the <br /> overall RWP budget as flat as possible, while accommodating new staff and unavoidable <br /> increases in areas such as insurance premiums. <br /> <br />Budget Assumptions <br /> <br />The following assumptions and/or projections form the basis of the FY 04-05 RWP Operating <br />Budget: <br /> <br />· The MWMC Key Outcomes and corresponding performance measures for FY 04-05, along <br /> with the MWMC Services Agreement, form the basis for the RWP Work Plan and Operating <br /> Budget. <br /> <br />· New National Pollutant Discharge Elimination System (NPDES) discharge permit <br /> requirements will be addressed operationally and in planning/development of CD projects,' <br /> and all permit conditions are intended to be met. <br /> <br />· New environmental challenges (e.g. Clean Water Act regulations) will be monitored and <br /> responded to. <br /> <br />· The addition of new staffwill lead to increased expenditures in some materials and services <br /> categories. Where possible, ongoing expenses are held fiat or reduced to offset unavoidable <br /> increases in some budget categories. <br /> <br />· For budget purposes, utility costs at the RWP facilities are assumed to increase by 6%. <br /> Actual cost increases will be a function of weather and potential additional increases in <br /> Eugene Water and Electric Board's wholesale power costs. Supplemental budget actions in <br /> FY 04-05 may be needed to fully fund actual utility expenses. <br /> <br />· Proposed annual cost of living wage adjustments include a 1% increase in base salaries for <br /> Eugene, and a 2.5% increase in base salaries for Springfield. <br /> <br />· Property and liability insurance costs are expected to increase up to 20% over FY 03-04 <br /> amended budget levels, due to inflation and the addition of new MWMC capital assets. <br /> <br /> April, 2004 DRAFT Page 2 FY 04-05 BUDGET AND CIP <br /> <br /> <br />