Laserfiche WebLink
Once the value of existing assets is allocated across the four capacity parameters, the next step is to <br />determine the value of available capacity. Table 6 presents this calculation, showing the allocation of <br />existing system asset value to growth - based on the percentage of available capacity shown in Table 4 <br />(column b). The Table 6 allocation takes an additional step of classifying available capacity into liquid <br />stream and biosolids (a line item in Table 5), due to the different availability of capacity for biosolids <br />processing relative to that of other processes. Table 4 shows available capacity percentages for liquid <br />stream processing; a similar process was undertaken to derive the available capacity for biosolids <br />processing, the results of which are summarized in Table 6 (with more details shown in SDC <br />Methodology Appendix C, Table C-3). Table 2 consolidates the growth costs by parameter (with BOD <br />and TSS each receiving 50 percent of the biosolids costs shown in Table 6. <br /> <br />Table 6 <br />Value of Available Capacity <br /> <br />Asset Type Total Cost Growth % Growth $ <br /> <br />Liquid Stream <br />Average Flow $11,420,083 10.5% $1,204,444 <br />Peak Flow $24,342,874 0% $0 <br />BOD $9,241,791 17% $1,568,304 <br />TSS $7,034,861 9.6% $677,941 <br />Subtotal $52,039,610 $3,450,688 <br />Biosolids <br />General $13,760,968 0% $0 <br />Dewatering $8,983,417 16% $1,451,031 <br />Land application $6,253,297 0% $0 <br />Subtotal $28,997,682 $1,451,031 <br /> <br />Total $81,037,292 $4,901,719 <br /> <br />Determine Cost Basis - Future Facilities <br />The process for calculating the improvement fee cost basis is methodologically similar to determining <br />the cost basis for the existing system, with the additional steps of allocation to project type <br />(performance, rehabilitation, capacity) and associated project users. This process is shown <br />schematically in Figure 3 (as described in the SDC Methodology). As the figure shows, the process <br />begins with an analysis of the 20-year project list. <br /> <br /> <br />