Item 4 - PH on MWMC Reg. SDCs
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/14/04Mtg
>
Item 4 - PH on MWMC Reg. SDCs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:10:03 PM
Creation date
6/10/2004 3:21:26 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/14/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIGURE 3--PROJECT COST ALLCOATION <br /> <br />STEP I-1 · · <br /> <br />STEPI-4 <br /> <br /> % of Total FUture % of Capacity <br /> Load Expansion <br /> Allocation Basis 0% <br /> <br /> Table 7 shows project costs from the proposed 20-year project list allocated to facility components and <br /> capacity parameters by project type (performance, capacity, and rehabilitation). Table 8 shows the <br /> allocation of project costs to growth by project type and capacity parameter. For liquids capacity <br /> expansion, the growth percentages are derived from column (c) of Table 4. For liquids performance <br /> upgrades, the percentages of costs allocated to growth are derived from column (a) of Table 4. (It <br /> should be noted that rehabilitation costs are associated with a few specific line items from the 20-year <br /> project list.) For biosolids upgrades (both capacity and performance type projects), the percentages of <br /> costs allocated to growth are derived from the subcategories as presented in Appendix C (Table C-3) of <br /> the SDC Methodology. <br /> <br /> <br />