Laserfiche WebLink
Table 8 <br />A/location of 20-Year Project List Costs to Growth <br />Project Total Cost Growth % Growth $ <br />Average Flow $26,331,534 26% $6,862,671 <br />Peak Flow $6,813,675 11% $737,943 <br />BOD $11,221,161 26% $2,911,436 <br />TSS $12,843,631 26% $3,357,524 <br />Biosolids <br />BS - General $10,246,000 32% $3,253,299 <br />BS - Dewatering $0 16% $0 <br />BS - Bio Cycle Farm $1,510,000 22% $334,859 <br />Subtotal $68,966,000 25% $17,457,733 <br />Average Flow $7,397,500 100% $7,397,500 <br />Peak Flow $40,516,250 29% $11,916,544 <br />BOD $6,921,250 100% $6,921,250 <br />TSS $6,065,000 100% $6,065,000 <br />Biosolids <br />BS - General $8,054,000 100% $8,054,000 <br />BS - Dewatering $0 na na <br />BS - Bio Cycle Farm $0 100% $0 <br />Subtotal $68,954,000 59% $40,354,294 <br />Subtotal $6,080,000 0% $0 <br />Total $144,000,000 40% $57,812,027 <br /> <br />The total future project costs allocated to growth from Table 8 are used to determine the unit costs of <br />capacity reflected in Table 3. Table 3, like Table 2, consolidates the growth costs by parameter and <br />summarizes the cost per unit of capacity (derived by dividing the total cost per parameter by the <br />projected growth units). <br /> <br />Tables 7 and 8 summarize the results of individual project cost allocation. To illustrate the application <br />of the methodological steps, as shown in Figure 3, to individual projects from the proposed 20-year <br />project list, several examples are provided bellow. <br /> <br />Project Allocation Example A: Collection System, Screw Pump Station Expansion <br />Total cost of the project is $1.7 million. Basis of improvement fee for this project is: <br />$650,000 or approximately 38% of the total project cost, derived as follows: <br /> <br />Step 1: Allocation of project to facility components <br /> · 1/2 to Collection System Pump Stations = 50% x $1,700,000 = $850,000 <br /> · 1/2 to Peak Flow Management -- 50% x $1,700,000 = $850,000 <br />Step 2: Allocation of facility components to capacity parameters <br /> · Collection System Pump Stations: 1/4 average flow = 25% x $850,000 = $212,500; 3/4 peak flow <br /> = 75% x $850,000 = $637,500 <br /> · Peak Flow Management facility component is allocated 100% to Peak Flow capacity parameter = <br /> 100% x $850,000 = $850,000 <br /> Step 3: Allocation of project to project type <br /> · 100% of project (both Collection System Pump Stations and Peak Flow Management) is Capacity <br /> project type <br /> Step 4: Allocation of project to user type <br /> <br /> <br />