Laserfiche WebLink
SYSTEM DEVELOPMENT CHARGE METHODOLOGY <br /> <br />The reimbursement fee is based on the value of available capacity in the system that will <br />serve growth. The improvement fee is based on future facility costs associated with <br />providing growth's additional capacity needs (above what is already available in the <br />system). Together, the reimbursement and improvement fees recover costs equal to <br />growth's capacity needs. <br /> <br />Existing system available capacity and future improvement costs needed to expand capacity <br />for growth are distributed to capacity parameters (average flow, peak flow, biochemical <br />oxygen demand [BOD], and total suspended solids [TSS]), and spread over the total growth <br />units projected for the period to determine weighted average reimbursement and <br />improvement unit costs. The SDCs for individual developments are then determined by <br />applying the unit costs (by fee element and capacity parameter) to the individual <br />development estimated capacity requirements, and summing the results. The total SDC for <br />each development is then reduced by any applicable credits for past and future capital <br />payments. <br /> <br />Table 2 provides an example calculation for a single capacity parameter. The numbers <br />included in the table are intended to illustrate the methodology only (when applied to the <br />single capacity parameter of average flow); the numbers do not represent MWMC planning <br />criteria or cost data. Furthermore, the total SDC would include similar calculations for other <br />capacity parameters (i.e., peak flow, BOD, and TSS). In the example provided, total system <br />capacity needs at the end of the planning period are 60 million gallons per day (mgd). <br />Existing users are estimated to require 45 mgd (90 percent) of existing capacity, leaving <br />5 mgd (10 percent) available for growth. However, growth's total needs are 15 mgd, <br />meaning that additional investment will be required to expand system capacity by 10 mgd. <br /> <br /> TABLE 2 <br /> Example Calculation for Single (Average Flow) Capacity Parameter* <br /> <br /> Existing Future <br /> Element Total System Expansion <br /> <br /> Determine Capacity Needs <br /> Systemwide Capacity (mgd) 60 50 10 <br /> Existing Users (mgd) 45 45 0 <br /> Growth (mgd) 15 5 10 <br /> Determine Cost Basis Needs 10% 100% <br /> Systemwide Cost $50,000,000 $12,000,000 <br /> Growth Cost $17,000,000 $5,000,000 $12,000,000 <br /> Determine SDC Schedule <br /> Weighted Average Unit Cost ($/mgd) $1,133,333 $333,333 $800,000 <br /> User Capacity Requirement (mgd) 0.00035 0.00035 0.00035 <br /> Total SDC $396.67 $116.67 $280.00 <br /> *Example only; not MWMC specific <br /> <br /> SEA31003271388(DG).DOC~41040034 3 <br /> <br /> <br />