Laserfiche WebLink
SYSTEM DEVELOPMENT CHARGE METHODOLOGY <br /> <br />FIGURE 2--EXISTING SYSTEM ALLOCATION <br /> <br /> YES <br /> Reimbursement <br /> Fee Cost Basis <br /> <br />TABLE 4 <br />Existing System Available Capacity by Parameter <br /> <br /> Average Flow Peak Flow BOD TSS <br /> Variable (mgd) (mgd) (lbs/day) (lbs/day) <br /> <br />Existing capacity 49.0 175 66,000 71,600 <br />Current loading (current capacity required) 43.8 264 54,800 64,700 <br />Available capacity (value) 5.2 None 11,200 6,900 <br />Available capacity (%) 10.5% 0% 17% 9.6% <br />Source: 2004 Facilities Plan <br /> <br />Step Three- Project Cost Allocation <br />The project cost allocation methodology, for use in determining the improvement fee cost <br />basis, is a four-step allocation process consisting of the following steps: <br /> <br />I-1. Allocate project costs to facility process components (e.g., primary treatment, secondary <br /> treatment). <br />I-2. Allocate costs by components to system capacity parameters (e.g., average flow, peak <br /> flow). <br />I-3. Allocate project costs to type (capacity improvement, per[ormance upgrade, or <br /> rehabilitation). <br />I-4. Allocate costs to user type (existing customers or projected growth). <br /> <br /> SEA31003271388(DG).DOC/041040034 <br /> <br /> <br />