My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A - PH on MWMC/Metro Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/22/04JEO
>
Item A - PH on MWMC/Metro Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:57:24 PM
Creation date
6/17/2004 8:20:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 55999 <br /> Page 16 of 26 Pages <br /> <br /> SCHEDULE E ' ' <br /> Pretreatment Activities : <br /> <br />.The permittee shall implement the following pretreatment activities: ' <br /> <br />1. The permittee shall· conduct.and enforce its Pretreatment Program, as approved by the Department, and <br /> comply .with the General Pretreatment Regulations' (40 CFR Part 403). The permittee shall secure and <br /> maintain sufficient resources and qualified personnel to carry out the program implementation procedt~res <br /> described in this permit. ' <br />2. '-THY p~rn~.~ff-sha-ll ~i,doP't .all }?gal author[t},_ necessary td fully implement l~s 'app~ove~l' pr~e~'atr~'~n'i' ' .... <br /> ..program and to compty wire an.applicable State .and Federal pretreatment regulations: The-permittee' <br /> must also establish~ where necessary, contracts or agreements with contributing jurisdictions to ensure <br /> compliance with.pretreatment requirements by industrial.users within these jurisdictions. These'contracts <br /> or agreements .shall identify the agency responsible for hlI implementation and enforcenient activities to' <br /> · be perfo.rmed in the con~ibuting.jurisdictions... Regardless .of jurisdictional situation, .the permittee is <br /> respon..sible for ens .uring that aH aspects of.the pretreatment program aec fully implemented and enforced. <br />3. The permittee shall update its inventory of industrial-users at a frequency and diligence adequate to.- <br />" '..ensure proper identification of industrial ~ers subject t° pretreatment.standards, but no less than once per <br /> year. The permit-tee shall notify .these indtistrial users of applicable pretreatment standards in accordance <br /> with 40 CFR § 403.8(f)(2)(iii). <br /> <br />4. The permittee shall enforce categorical pretreatment standards promUlgated pursuant to Section 307(b) <br /> and (c) of the Act, prohibited discharge' standards as set forth in. 40 CFR'i}. 403.5(a) and (b), or local <br /> limitations developed 'by.the permittee in accordance with 40. CFR, §' 403.5(c), which.ever are' more <br /> stringent, or are applicable to non-domestic users discharging wastewater-to the. collection system. <br /> Locally derived discharge Iimitations shall be defined as pretrea.tment standards under Section 307(d) of. <br /> the Act. <br /> <br /> 'A technical evalUation of the need to revise local- limits shall be performed at least once during the .t&rm <br /> of ,tl}.is.lPermit.and .mu_st be submitted~to the Department as part of the permittee's NPDES permit <br /> ap. pncauon, unless me Department reqmre~ in writing that it-be submitted sooner. Limits :development <br /> wall be in accordance with the procedures established by the Department. · <br /> <br />5. The permittee shall issue individual diseharge permits to 'all Significant Industrial Users in a timely <br /> manner. The permittee shall also reissile and/or modifg, permits, where necessary, in'a timely manner. <br /> Discharge permits must contain~ at a minimum, the conditions identified in 40 CFR § 403.8(f)(1)(iii). <br /> Unless a more stringent definition has been adopted by the permittee, the d. efinition of Significant <br /> Industrial User shall.be ~ stated in 40 CFR § 403.3(t). <br /> <br />6. The permktee shall randomly sample and analyze in~lustrial user effluents at a frequency commensurate <br /> ~ith.,the ch_a~cter., consistency, volume of discharge. At a minimum, the permittee shall sample all <br /> ~.~gm.n..eant,ln.d, ustnal, Use..rs_.for .all regulated pollutants twice per. year.- Alternatively, at a minimum, 'the <br /> p.ermt=ee snail sampie, all siguiticant' Industrial Users for all regulated pollutants once per year, if the <br /> p6rmittee, has pretreatment program criteria in its approved procedures for determining appropriate <br /> sampling levels for industrial users, and provided the sampling criteria indicate once per year sampling is <br /> adequate. At a.minimum, the permittee shall conduct a complete facility inspection once per year. <br /> Additionally, at least once every two years the permittee shall evaluate the need for each Significant <br /> Industrial User to develop a slug control plan. Where a plan is deemed necessary, it shall conform to' the <br /> requirements of 40 CFR {} 403.8(f)(2)(v). <br /> o <br /> <br /> - Where the permittee elects to conduct all industrial user monitoring in lieu of requiring self-monitoring <br /> by user, the permittee shall gather all information which would otherwise have been submitted by the <br /> user. The permittee shall also perform the sampling 'and analyses in accordance with the protocols <br /> established for the user. <br /> <br /> Sample collection and analysis, and the gathering of other compliance data, shall be performed with <br /> sufficient care to produce evidence admissible in enforcement proceedings or in judicial actions. 4-40 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.