Laserfiche WebLink
Metropolitan Wastewater Management Commission ('~vIWMC"), an entity <br /> formed under an intergovernmental agreement created pursuant to ORS 190. <br /> Together, these collection facilities (which exclude private laterals which <br /> convey wastewater from individual residential or commercial/industrial <br /> connections) constitute the primary collection system. . . <br /> <br /> 12. The primary collection system conveys wastewater to a treatment facilities <br /> system owned and operated by MWMC. This system consists of an <br /> interconnected Water Pollution Control Facility ("WPCF"), a bi0solids <br /> facility and a ben.eficial reuse facility. <br /> <br />Policies <br /> <br />G. 9 Wastewater conveyance and treatment shall be provided to meet the needs of <br />projected growth inside the UGB that are capable of complying with regulatory <br />requirements governing beneficial reuse or discharge of effluent and beneficial reuse or <br />disposal of residuals. <br /> <br />6. Renumber all subsequent findings and policies accordingly. <br /> <br />7. Modify Chapter V. Glossary, by modifying the definition of Public <br />Facilities Projects as follows: <br /> <br />Public Facility_ Pro_iects <br /> <br />Public Facility Project lists and maps adopted as part of the Metro Plan are defined as <br />follOws: <br /> <br />Water: SoUrce, reservoirs, pump stations, and Primary distribution systems. <br /> Primary distribution systems are tran.qrnission lines 12 inches or larger for <br /> SUB and 24 inches or larger for EWEB. <br /> <br /> Wastewater: Primary Collection SyStem: Pump stations and wastewater lines 24 inches <br /> or larger. <br /> Treatment Facilities System: Water Pollution Control Facility (WPCF) <br /> project, beneficial reuse project and residuals project necessary to meet <br /> wastewater treatment facilities system design capacities for average flow, <br /> peak flow, biochemical oxygen demand and total suspended solids so as to <br /> provide service within the Urban growth boundary (UGB) for a. projected <br /> population in 2025 consistent with the population assumed in this Plan, in <br /> compliance with MWMC's discharge permit. MWMC's Capital <br /> Improvements Plan, as amended from time to t~me, shall be used as the <br /> guide for detailed planuing and implementation of the WPCF project, the <br /> beneficial reuse project and the residuals project. <br /> <br /> V:kSDCkMetro Plan Amendment.doc <br /> Last printed Last printed 3/2/2004 4:54:00 PM 1-46 <br /> <br /> <br />