My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A - PH on MWMC/Metro Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/22/04JEO
>
Item A - PH on MWMC/Metro Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:57:24 PM
Creation date
6/17/2004 8:20:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater: Drainage/channel improvements and/or piping systems 36 inches or ..:. <br /> l~rger;, proposed detention ponds; ouffalls; water quality projects; and <br /> waterways and open systems. <br /> <br />Specific projects adopted as part of the Metro Plan are described in the Project Lists and <br />their general location is identified in the Planned Facilities Maps in Chapter II of the <br />Eugene~pringfield Metropolitan.drea Public Facilities and Services Plan. <br /> <br />6. Modify the Project Lists and Planned Facilities Maps as follows: <br />1. Modify the text preceding existing Table 3 to read as follows: <br />Planned Wastewater System Improvements <br />planned ~'~-~ ~ ~-~ tc.'-~ wastewater system improvement projects are listed in <br />tables3, an~ 4, 4a and 4b. The general location of these facilities is shown in Map 2: <br />Planned Wastewater Facilities, and'Map 2a: Existing Wastewater Collection and <br />Treatment Systems. <br />2. Insert, following Table 4, Tables 4a and 4b, as follows: <br />Table 4a <br />MWMC Wastewater Treatment System Improvement Projects <br /> <br /> Project Project Name/Description <br /> Number <br /> 300 WI)CF Treatment Project <br /> 301 Resid~al s Treatment Project <br /> 302 Beneficial Reuse Project <br /> Table 4b <br /> MWMC Primary Collection System Improvement Projects <br /> Project Project Nme/Description <br /> Number <br /> 303 Willakenzie Pump Station <br /> 304 Screw pump Station <br /> 305 Glenwood Pump Station <br /> <br /> 3. Modify Map 2 to show Projects 300 through 305, and insert Map 2a <br /> <br /> V:kSDCklVletro Plan Amendment. doc. <br /> Last printed Last 15rinted 3/2/2004 4:54:00 PM 1-47 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.