My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A - PH on MWMC/Metro Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/22/04JEO
>
Item A - PH on MWMC/Metro Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:57:24 PM
Creation date
6/17/2004 8:20:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
View images
View plain text
To: The Plarming Commissions of Springfield, Eugene and Lane County <br /> From: Gregory Mort, Planning~~~'v <br />· Date: 20, 2004 --'--- <br /> <br /> Subject: Metro Plan Text Amendments, Public Facilities and Services Plan Amendments <br /> <br /> ~sue <br /> The Metro Plan and the Public Facilities and Services' Plan (PFSP) are proposed to be amended to: 1. <br /> clarify the relationship between the types of facilities projects included in the PFSP and projects ~.at <br /> appear in local capital improvement plans; 2. update the PFSP maps based on neW.statutory provmons; <br /> 3. reflect current conditions and planned regional wastewater facilities consistent with the MWMC <br /> Facilities Plan; 4. resolve inconsistencies among metro-wide planning documents; and, 5. adopt a <br /> separate amendment process for the Public Facilities and Services Plan. <br /> Discussion <br /> The proposed amendments are considered Type I Metro Plan amendments because for the most part they <br /> are nOn-site specific amendments of the Plan text. Amendments to the Plan text, which text includes <br /> functional plans such as TransPlan and the PFSP, that are non site-specific require approval by all three <br /> governing bodies to become effective (See SDC 7.070(1)(a), Eugene Code 9.7730(1)(a), and Lane COde <br /> 12.225(1)(a)(i)). The planning commissions will conduct the initial evidentiary hearing and then forward <br /> the record of this heating and a recommendation to their respective elected officials. The planning <br /> commissions may take this action collectively or independently as the circumstances warrant. The <br /> elected officials shall conduct a joint public hearing on the amendments and shall make a decision based <br /> solely on the record of evidence created before the planning commissions. Each governing body may <br /> approve, modify and approve, or deny the proposed amendment. HoweVer, all three governing bodies <br /> must adopt identical ordinances to complete the amendment process. <br /> The MWMC Proposal <br /> MWMC is proposing several changes to the Metro Plan text in Chapter HI, Secti°n G Public Facilities <br /> and Services Element and Chapter V Glossary. The changes in Section HI-G include modification of <br /> introductory text (pages III-G-1 and III-G-2) by adding the term VYastewater to the list of services to <br /> development within the urban growth boundary; modification of Policy G.2 (page HI-G-4) by adding the <br /> term capital im£rovementplans to the list of activities intended to implement projects in the PFSP; <br /> modify Finding 6 (page III-G-4) to include a reference to Map 2a; modification to Policy G.3 (page HI-G- <br /> 4) to include a reference to Map 2a; addition of text.following Policy G.8 (page HI-G-5) by inserting the <br /> heading "Services to Development within the Urban Growth Boundary: Wastewater;" adding new <br /> findings 11 and 12 after Policy G-8 (page IH-G-5) identifying' sanitary sewer collection facilities in each <br /> city; adding new policy G.9 (page HI-G-6) that requires wastewater conveyance and treatment inside the <br /> ugh that is capable of complying with state' and/or federal regulations for reuse, discharge or disposal; <br /> subsequent renumbefing of all findings and policies in HI-G as a result of these amendments; and, <br /> modification of Chapter V Glossary by amending the definition of Wastewater under "Public Facilities <br /> Projects" (page V4) by adding a definition of Treatment Facilities System to the existing definition of <br /> Primary Collection System under the heading Wastewater.. <br /> In addition to the foregoing Changes to the Metro Plan, MWMC is proposing changes to the PFSP to <br /> make this functional plan internally consistent with the Metro Plan. This consistency will be achieved by <br /> modifying text preceding existing Table 3 (page 28) by adding references to Tables 4a and 4b and Map <br /> 2a; inserting new Tables 4a and 4b (page 28); inserting new Map 2a (page 35); modifying Chapter IV, <br /> Wastewater System Condition Assessment (page 82) with a new paragraph titled "MY/MC Waste'water <br /> <br /> ATTACHMENT 1-1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).