My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 7 - Action MWMC Fac. Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/28/04Mtg
>
Item 7 - Action MWMC Fac. Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:54:44 PM
Creation date
6/24/2004 8:57:51 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESPONSE TO WRITTEN TESTIMONY AT EUGENE CITY COUNCIL PUBLIC HEARING ON THE MWMC WASTEWATER FACILITIES PLAN AND SDC METHODOLOGY <br /> <br />Digestion Expansion/Class A Capability, First Full Paragraph Top of Page 7 <br /> <br />All of the projects in the 20-year project list are required either to meet specific regulatory <br />and/or capacity requirements, involve implementation of adopted policies by the MWMC <br />as recommended to them by Citizen's Advisory Committees, were specifically directed by <br />the MWMC for worker and community protection (i.e., conversion of the disinfection <br />system), or some combination of the above. <br /> <br />The $13.8 million Digestion Expansion/Class A Capability project is an example of a project <br />that meets multiple criteria as it contains both a component to meet specific capacity needs <br />and a component to address a long-term policy goal of the Commission to achieve a higher <br />level of biosolids quality (the Environmental Protection Agency's Class A criteria). As <br />documented on page 8-12 of Section 8 of the 2004 MWMC Facilities Plan: <br /> <br /> "This project provides additional digestion capacity (approximately one third of the cost) and would <br /> convert MWMC to a Class A biosolids program (remaining two thirds of the cost) which would provide <br /> additional enhanced capability to address higher community performance standards. The allocation is <br /> split one third/two thirds between Capacity and Performance." <br /> <br />By spending the $9.2 million (two thirds of $13.8 million), MWMC will receive the benefit of <br />achieving a higher quality biosolids product that will give them more flexibility in terms of <br />ultimate disposal/reuse options, and which reduces operational costs associated with <br />administering the biosolids management program. Also, because of the higher level of <br />performance being provided by the Class A process, MWMC is able to avoid spending $6 <br />million on a fifth biosolids storage lagoon at the remote Biosolids Management Facility <br />(BMF). Therefore, the net additional incremental cost of going to Class A is $3.2 million ($9.2 <br />million minus $6 million). Finally, if MWMC chose not to convert digestion to Class A and <br />instead opted to construct the fifth biosolids storage lagoon, the SDC rate would increase <br />because the lagoon would be allocated to "Capacity" instead of "Performance." Referring to <br />the 'General' column of Table C-3: Capacity Summary of MWMC Biosolids Facilities of the <br />SDC Methodology, 100 percent of the lagoon project would be allocated to growth while <br />only 31.8 percent of the Class A portion of the Digestion Expansion/Class A Capability <br />project would be allocated to growth. <br /> <br /> If MWMC does not implement Class A: 100 percent of $6 million = $6 million <br /> <br /> If MWMC does implement Class A: 31.8 percent of $9.2 million = $2.9 million <br /> <br />This example illustrates a core feature of the 2004 Facilities Plan to existing and future users. <br />Because of the approach to enhance existing facilities that address multiple issues instead of <br />constructing new facilities, this Plan saves MWMC money, thereby keeping sewer rates and <br />SDCs well below the State averages. <br /> <br />Finally, with regards to digestion technology assessment as recommended in the 2004 <br />Facilities Plan, digestion technology advancements are a work-in-progress and will continue <br />to evolve as additional research and development occurs. Detailed design of a Digestion <br />Expansion/Class A Capability project is not scheduled to commence until 2011 or in 7 years. <br />It would not be prudent to lock MWMC to a certain technology approach at this time. <br /> <br />C:\DOCUMENTS AND SETTINGS\CEEXELF~LOCAL SETTINGS\TEMPORARY INTERNET FILES\OLK3B~AIS HBALE~rERSFROMCH2 FINAL DRAFT 061804.DOC 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.