My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 7 - Action MWMC Fac. Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-06/28/04Mtg
>
Item 7 - Action MWMC Fac. Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:54:44 PM
Creation date
6/24/2004 8:57:51 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESPONSE TO WRITTEN TESTIMONY AT EUGENE CITY COUNCIL PUBLIC HEARING ON THE MWMC WASTEWATER FACILITIES PLAN AND SDC METHODOLOGY <br /> <br />Rehabilitation and Replacement, Fifth Paragraph of Page 8 <br /> <br />There are seven projects on the 20-year project list that are allocated 100 percent to <br />rehabilitation: <br /> <br />1. River Avenue Improvements <br />2. Biosolids Management Facility (BMF) - Line Lagoons Phase 1 <br />3. BMF - Line Lagoons Phase 2 <br />4. BMF - Line Lagoons Phase 3 <br />5. BMF - Line Lagoons Phase 4 <br />6. Repairs/Partial Replacement of Biosolids Force Main <br />7. Support Development of Private Lateral Program <br /> <br />Although other projects on the list, such as Primary Clarifier Enhancements, Secondary <br />Clarifier Enhancements, and Digester Mixing Improvements, involve work on existing <br />facilities to retrofit or upgrade them with new equipment and technologies, this work is <br />expressly intended to create more capacity by upgrading/enhancing the capability and/or <br />performance of the existing infrastructure. They are not rehabilitation projects. It is this <br />approach system-wide, which maximizes the use and improvement of existing facilities as <br />opposed to the more costly alternatives that would rely on construction of additional new <br />facilities, that has enabled MWMC to adopt the least cost alternative. "Rehabilitation" <br />projects are projects that are intended to extend the life of an existing facility. These projects, <br />such as concrete sealing, roof rehabilitation, etc., are not conducted to provide increased <br />capacity. They simply maintain the current facilities. Except for the projects noted in the list <br />above, rehabilitation and equipment replacement activities are planned and funded <br />separately from the Facilities Plan. For example, as part of implementing the 2001 Wet <br />Weather Flow Management Plan, Eugene and Springfield are spending $21.5 million in local <br />(not MWMC) sewer funds on collection system rehabilitation to implement the Cities' <br />commitment to the most cost-effective infiltration and inflow removal work. The MWMC <br />will spend approximately $26 million on treatment rehabilitation (primarily replacing worn <br />out equipment), which is implemented through MWMC's Major Rehabilitation and <br />Equipment Programs. These projects and funding are managed by Eugene and are reviewed <br />and approved by the MWMC through the annual capital improvements planning process. <br />They are not part of the Facilities Plan or the 20-year project list. They are funded only by <br />user fees, and have no bearing on SDC calculations. <br /> <br /> C:\DOCUMENTS AND SETTINGS\CEEXELRLOCAL SETTINGS\TEMPORARY INTERNET FILES\OLK3B~AIS HBALETTERSFROMCH2 FINAL DRAFT 061804.DOC 6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.